Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberBLD97-00040
StatusFinaled
Name GARY CHRISTENSEN
Site Address 2323 S VISTA AVE
Project NameVISTA/TARGEE-BLDG A
Customer Number 
ePlanReviewNo
Description
VISTA/TARGEE OFFICE/RETAIL COMPLEX BLDG. A * (SHELL BUILDING ONLY) TO CONSTRUCT A NEW TWO STORY MULTI-TENANT, CONCRETE TILT-UP, TYPE II NONRATED, FULLY FIRE SPRINKLERED, 32,256 SQ. FT. OFFICE BUILDING. THE FIRST FLOOR IS APPROXIMATELY 16,128 SQ.FT., 14,302 SQ.FT. IS UNFINISHED FOR FUTURE TENANT IMPROVEMENTS. THE SECOND FLOOR IS APPROXIMATELY 15,448 SQ.FT., 13,888 IS UNFINISHED FOR FUTURE TENANT IMPROVEMENTS. THIS PERMIT INCLUDES THE EGRESS CORRIDORS, ELEVATOR AND RESTROOM WITHIN THE CORE OF THE BUILDING ON THE FIRST AND SECOND FLOORS ALONG WITH RELATED SITE WORK FOR THIS BUILDING. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED REQUIREMENT LIST, CABO/ANSI STANDARDS AND THE 1994 EDITION OF THE UBC. THIS PERMIT DOES NOT ALLOW FOR OCCUPANCY OF THE BUILDING, SEPARATE PERMITS AND CERTIFICATE OF OCCUPANCIES MUST BE OBTAINED FOR EACH TENANT IMPROVEMENT SPACE. MJP (PC#010.97) DR-128-96
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final3/2/19983/2/19983/2/1998PPASS
DetailsJim Storey
03/02/98 301 - ###-#### brian FNL -OK FINAL l/c only no occupancy approved
INSP - Final2/27/19982/27/19983/2/1998PPASS
DetailsJim Storey
02/27/98 301 - brian ###-#### FNL -OK FINAL for l/c only no occupincy with out permit. ì
INSP - Final2/23/19982/24/19982/24/1998AFAIL
DetailsJim Storey
02/24/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP-Final Inspection2/23/19982/23/19982/23/1998PPASS
DetailsRick Jackson
BLDG A SHELL--BRIAN ###-#### completed elevator alarm test. occ approved
INSP - Final2/20/19982/20/19982/20/1998PCANC
DetailsJoe Tawney
02/20/98 406 - brian ###-#### needs at 1:oo CANCELLED THIS WAS DOUBLE ENTRY FOR 406 AND 409
INSP - Final2/20/19982/20/19982/20/1998PCANC
DetailsJim Storey
02/20/98 301 - brian ###-#### cancled by brian
INSP-Final Inspection2/20/19982/20/19982/20/1998PFAIL
DetailsJoe Tawney
02/20/98 406 - ###-#### brian ELEVATOR RECALL TEST FAIL ALSO NO DET IN CONTROL ROOM
INSP-Final Inspection2/18/19982/19/19982/19/1998ANH
DetailsJoe Tawney
02/19/98 406 - ###-#### 9:00 AM CONTR OR ALARM VENDOR NOT ON SITE
INSP - Wall cover2/18/19982/18/19982/18/1998 PASS
Suspended ceiling made ok on 1st floor, north 1/2.
INSP-Final Inspection2/17/19982/18/19982/18/1998PFAIL
DetailsRick Jackson
3:00 ###-#### retest elevator recall. add detector at FACP.
INSP - Framing/Rough-in2/17/19982/17/19982/17/1998PNR
DetailsBob Archibald
###-#### 1ST FLOOR CEILING GRID. no access.
INSP-Sprinkler Rough-in/Hydro2/17/19982/17/19982/17/1998PPASS
DetailsRick Jackson
###-#### 1ST FLOOR rough-in complete on both floors - okay for cover.
INSP - Framing/Rough-in2/12/19982/12/19982/12/1998PPART
DetailsJim Storey
02/12/98 301 - CEILING GRID 1ST FLOOR SOUTH END BRIAN ###-#### pending mech
INSP-Sprinkler Rough-in/Hydro2/11/19982/12/19982/12/1998PPASS
DetailsRick Jackson
1st floor shell rough-in only. alarms still require test.
INSP - Framing/Rough-in2/6/19982/9/19982/9/1998APART
DetailsJim Storey
02/09/98 301 - CEILING GRID ON 2ND FLOOR--BRIAN ###-#### SCLG-OK SUSPENDED CEILING west side 2nd floor only.
INSP - Framing/Rough-in2/4/19982/5/19982/5/1998PPART
DetailsJim Storey
02/05/98 301 - brian ###-#### ceiling grid OTH-OTHER AGENCIES NOT APPROVED mech.
INSP - Framing/Rough-in2/3/19982/4/19982/4/1998PFAIL
DetailsJim Storey
02/04/98 301 - ceiling ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED not ready do not cover ceilli grid call for reinsp.
INSP-Sprinkler Rough-in/Hydro2/3/19982/4/19982/4/1998PPASS
DetailsRick Jackson
###-#### rough-in of shell. dropped ceiling is part of shell.
INSP - Framing/Rough-in1/20/19981/21/19981/22/1998APASS
DetailsJim Storey
01/21/98 301 - EARLY PLEASE FRAM-OK FRAMING furrout walls ok for cover
INSP - Framing/Rough-in1/14/19981/15/19981/16/1998APART
DetailsJim Storey
PROBLEM CALL BRIAN AT ###-####
INSP - Framing/Rough-in1/12/19981/13/19981/13/1998APART
DetailsJim Storey
01/13/98 301 - framing ok on fur out pending ele insp.
INSP-Sprinkler Rough-in/Hydro1/8/19981/8/19981/8/1998PPASS
DetailsRick Jackson
hydro test between 1-3 passed hydro. not monitored/shell only
INSP-Final Inspection12/2/199712/3/199712/3/1997APASS
DetailsRick Jackson
INSP - Final11/7/199711/10/199711/10/1997ANR
DetailsJim Storey
11/10/97 301 -
INSP - Framing/Rough-in11/10/199711/10/199711/10/1997 PASS
DetailsJim Storey
/ / 301 - FRAM-OK FRAMING
INSP - Framing/Rough-in11/3/199711/4/199711/5/1997APART
DetailsJim Storey
/ / 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED FRAM-OK FRAMING
INSP - Framing/Rough-in10/23/199710/24/199710/24/1997ANR
DetailsJim Storey
10/24/97 301 - OTH-OTHER AGENCIES NOT APPROVED
INSP - Final10/7/199710/7/199710/7/1997PPART
DetailsJim Storey
10/07/97 301 - WIP -WORK IN PROGRESS FOR 1 HR CORRIDORS AND SHAFT ASSEMBLIES.
INSP-Sprinkler Rough-in/Hydro9/23/19979/24/19979/24/1997PPASS
DetailsRick Jackson
hydro completed, ok.
INSP - Footings4/22/19974/22/19974/22/1997PNR
DetailsJim Storey
04/22/97 301 - n/r si