INSP - Final | 3/2/1998 | 3/2/1998 | 3/2/1998 | P | PASS |
Jim Storey
|
|
|
03/02/98 301 - ###-#### brian FNL -OK FINAL l/c only no occupancy approved
|
INSP - Final | 2/27/1998 | 2/27/1998 | 3/2/1998 | P | PASS |
Jim Storey
|
|
|
02/27/98 301 - brian ###-#### FNL -OK FINAL for l/c only no occupincy with out permit. ì
|
INSP - Final | 2/23/1998 | 2/24/1998 | 2/24/1998 | A | FAIL |
Jim Storey
|
|
|
02/24/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP-Final Inspection | 2/23/1998 | 2/23/1998 | 2/23/1998 | P | PASS |
Rick Jackson
|
|
|
BLDG A SHELL--BRIAN ###-#### completed elevator alarm test. occ approved
|
INSP - Final | 2/20/1998 | 2/20/1998 | 2/20/1998 | P | CANC |
Joe Tawney
|
|
|
02/20/98 406 - brian ###-#### needs at 1:oo CANCELLED THIS WAS DOUBLE ENTRY FOR 406 AND 409
|
INSP - Final | 2/20/1998 | 2/20/1998 | 2/20/1998 | P | CANC |
Jim Storey
|
|
|
02/20/98 301 - brian ###-#### cancled by brian
|
INSP-Final Inspection | 2/20/1998 | 2/20/1998 | 2/20/1998 | P | FAIL |
Joe Tawney
|
|
|
02/20/98 406 - ###-#### brian ELEVATOR RECALL TEST FAIL ALSO NO DET IN CONTROL ROOM
|
INSP-Final Inspection | 2/18/1998 | 2/19/1998 | 2/19/1998 | A | NH |
Joe Tawney
|
|
|
02/19/98 406 - ###-#### 9:00 AM CONTR OR ALARM VENDOR NOT ON SITE
|
INSP - Wall cover | 2/18/1998 | 2/18/1998 | 2/18/1998 | | PASS |
|
|
|
Suspended ceiling made ok on 1st floor, north 1/2.
|
INSP-Final Inspection | 2/17/1998 | 2/18/1998 | 2/18/1998 | P | FAIL |
Rick Jackson
|
|
|
3:00 ###-#### retest elevator recall. add detector at FACP.
|
INSP - Framing/Rough-in | 2/17/1998 | 2/17/1998 | 2/17/1998 | P | NR |
Bob Archibald
|
|
|
###-#### 1ST FLOOR CEILING GRID. no access.
|
INSP-Sprinkler Rough-in/Hydro | 2/17/1998 | 2/17/1998 | 2/17/1998 | P | PASS |
Rick Jackson
|
|
|
###-#### 1ST FLOOR rough-in complete on both floors - okay for cover.
|
INSP - Framing/Rough-in | 2/12/1998 | 2/12/1998 | 2/12/1998 | P | PART |
Jim Storey
|
|
|
02/12/98 301 - CEILING GRID 1ST FLOOR SOUTH END BRIAN ###-#### pending mech
|
INSP-Sprinkler Rough-in/Hydro | 2/11/1998 | 2/12/1998 | 2/12/1998 | P | PASS |
Rick Jackson
|
|
|
1st floor shell rough-in only. alarms still require test.
|
INSP - Framing/Rough-in | 2/6/1998 | 2/9/1998 | 2/9/1998 | A | PART |
Jim Storey
|
|
|
02/09/98 301 - CEILING GRID ON 2ND FLOOR--BRIAN ###-#### SCLG-OK SUSPENDED CEILING west side 2nd floor only.
|
INSP - Framing/Rough-in | 2/4/1998 | 2/5/1998 | 2/5/1998 | P | PART |
Jim Storey
|
|
|
02/05/98 301 - brian ###-#### ceiling grid OTH-OTHER AGENCIES NOT APPROVED mech.
|
INSP - Framing/Rough-in | 2/3/1998 | 2/4/1998 | 2/4/1998 | P | FAIL |
Jim Storey
|
|
|
02/04/98 301 - ceiling ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED not ready do not cover ceilli grid call for reinsp.
|
INSP-Sprinkler Rough-in/Hydro | 2/3/1998 | 2/4/1998 | 2/4/1998 | P | PASS |
Rick Jackson
|
|
|
###-#### rough-in of shell. dropped ceiling is part of shell.
|
INSP - Framing/Rough-in | 1/20/1998 | 1/21/1998 | 1/22/1998 | A | PASS |
Jim Storey
|
|
|
01/21/98 301 - EARLY PLEASE FRAM-OK FRAMING furrout walls ok for cover
|
INSP - Framing/Rough-in | 1/14/1998 | 1/15/1998 | 1/16/1998 | A | PART |
Jim Storey
|
|
|
PROBLEM CALL BRIAN AT ###-####
|
INSP - Framing/Rough-in | 1/12/1998 | 1/13/1998 | 1/13/1998 | A | PART |
Jim Storey
|
|
|
01/13/98 301 - framing ok on fur out pending ele insp.
|
INSP-Sprinkler Rough-in/Hydro | 1/8/1998 | 1/8/1998 | 1/8/1998 | P | PASS |
Rick Jackson
|
|
|
hydro test between 1-3 passed hydro. not monitored/shell only
|
INSP-Final Inspection | 12/2/1997 | 12/3/1997 | 12/3/1997 | A | PASS |
Rick Jackson
|
|
|
|
INSP - Final | 11/7/1997 | 11/10/1997 | 11/10/1997 | A | NR |
Jim Storey
|
|
|
11/10/97 301 -
|
INSP - Framing/Rough-in | 11/10/1997 | 11/10/1997 | 11/10/1997 | | PASS |
Jim Storey
|
|
|
/ / 301 - FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 11/3/1997 | 11/4/1997 | 11/5/1997 | A | PART |
Jim Storey
|
|
|
/ / 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 10/23/1997 | 10/24/1997 | 10/24/1997 | A | NR |
Jim Storey
|
|
|
10/24/97 301 - OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Final | 10/7/1997 | 10/7/1997 | 10/7/1997 | P | PART |
Jim Storey
|
|
|
10/07/97 301 - WIP -WORK IN PROGRESS FOR 1 HR CORRIDORS AND SHAFT ASSEMBLIES.
|
INSP-Sprinkler Rough-in/Hydro | 9/23/1997 | 9/24/1997 | 9/24/1997 | P | PASS |
Rick Jackson
|
|
|
hydro completed, ok.
|
INSP - Footings | 4/22/1997 | 4/22/1997 | 4/22/1997 | P | NR |
Jim Storey
|
|
|
04/22/97 301 - n/r si
|