Permanent Occupancy | | 6/5/1997 | 6/5/1997 | | DONE |
|
|
|
|
INSP - Final | 6/3/1997 | 6/4/1997 | 6/4/1997 | P | PART |
|
|
|
06/04/97 338 - NO OCC REQ CARD ON THE SITE IF ALL SIGNOFFS ARE COMPLETE ME
|
INSP - Final | 5/29/1997 | 5/30/1997 | 5/30/1997 | P | PART |
|
|
|
05/30/97 338 - signed thwe temp col
|
INSP-Final Inspection | 5/29/1997 | 5/30/1997 | 5/30/1997 | A | PASS |
Joe Tawney
|
|
|
05/30/97 406 - REINSP FOR FINAL OK FOR PERM OCC
|
INSP - Occupancy Sign-off | 5/28/1997 | 5/29/1997 | 5/29/1997 | P | NR |
|
|
|
/ / 338 - not ready said he would recall for tomorrow after the ansul
|
INSP-Final Inspection | 5/28/1997 | 5/29/1997 | 5/29/1997 | A | FAIL |
Joe Tawney
|
|
|
05/29/97 406 - FINAL FAIL ADDRESS FIRE EXT LETTERING AIR BALANCE OCC SIG FAILED EMERG LIGHTS NOT WIRED PROPERLY NEED TO TEST DUCT DET
|
INSP - Ceiling grid | 5/20/1997 | 5/21/1997 | 5/21/1997 | A | PART |
|
|
|
05/21/97 338 -
|
INSP - Miscellaneous | 5/9/1997 | 5/12/1997 | 5/11/1997 | A | FAIL |
|
|
|
05/12/97 338 - not ready
|
INSP - Footings | 4/23/1997 | 4/23/1997 | 4/23/1997 | | PASS |
|
|
|
/ / 333 - FTG -OK FOOTING at reefer
|
INSP - Foundation | 4/23/1997 | 4/23/1997 | 4/23/1997 | | PASS |
|
|
|
/ / 333 - FDN -OK FOUNDATION at reefer
|
INSP - Foundation | 4/22/1997 | 4/23/1997 | 4/23/1997 | P | PASS |
|
|
|
04/23/97 338 - FND. REINSPECTION r-bar place ok to pour the slab too mo
|
INSP - Footings | 4/21/1997 | 4/22/1997 | 4/22/1997 | A | PASS |
|
|
|
04/22/97 338 - verbal corrections fixed in my presence
|
INSP - Wall cover | 4/17/1997 | 4/18/1997 | 4/18/1997 | A | PASS |
|
|
|
04/18/97 338 - made ok to cover the ext walls
|
INSP - Wall cover | 4/16/1997 | 4/17/1997 | 4/17/1997 | P | NR |
|
|
|
04/17/97 338 - not ready OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Framing/Rough-in | 4/8/1997 | 4/8/1997 | 4/7/1997 | P | PART |
|
|
|
04/08/97 338 - TERRY WILL BE THERE
|
INSP - Foundation | 3/31/1997 | 4/1/1997 | 3/31/1997 | P | PASS |
|
|
|
04/01/97 338 - this is a slab insp
|
INSP - Foundation | 3/20/1997 | 3/20/1997 | 3/19/1997 | P | PART |
|
|
|
03/20/97 338 - boston market/ stem wall verbal corrections to be correct confirmed by the spec insp
|
INSP - Footings | 3/17/1997 | 3/17/1997 | 3/16/1997 | P | NR |
|
|
|
03/17/97 338 - BOSTON MARKET special insp to verify all r-bar placement
|
INSP - Footings | 3/17/1997 | 3/17/1997 | 3/16/1997 | P | NR |
|
|
|
03/17/97 338 - Please call first @ ###-#### - alpha pager - would like i possible for this afternoon. not ready
|