INSP - Final | 7/18/1997 | 7/18/1997 | 7/18/1997 | P | PASS |
Jim Storey
|
|
|
Monica said that you needed to look at this once more before you signed the final occupancy request ASAP he came in at 7:30 this morning and needs it soon final ok as per jstorey
|
Permanent Occupancy | | 7/17/1997 | 7/17/1997 | | DONE |
|
|
|
|
Permanent Occupancy | | 7/17/1997 | 7/17/1997 | | DONE |
|
|
|
|
INSP - Final | 7/2/1997 | 7/2/1997 | 7/2/1997 | P | PASS |
Jim Storey
|
|
|
recieved special insp. letter of compliance that all work was as per plan and code stamped by brent inghram p.e. letter sent for archiveal.
|
INSP - Temporary occupancy | 6/27/1997 | 6/30/1997 | 6/30/1997 | A | PART |
Jim Storey
|
|
|
06/30/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED tenp occ. ok. 90 day
|
INSP-Final Inspection | 6/25/1997 | 6/25/1997 | 6/25/1997 | P | PASS |
|
|
|
signage ok
|
INSP-Sprinkler Rough-in/Hydro | 6/24/1997 | 6/24/1997 | 6/24/1997 | P | PASS |
|
|
|
HYDRO ALL
|
INSP-Final Inspection | 6/13/1997 | 6/13/1997 | 6/13/1997 | P | PART |
|
|
|
temp occ of office approved, no gas storage allowed until final
|
INSP-Sprinkler Rough-in/Hydro | 6/6/1997 | 6/6/1997 | 6/6/1997 | P | PART |
|
|
|
FIRE PUMP TEST, 1:30 operating points checked
|
INSP-Supply line flush | 6/5/1997 | 6/5/1997 | 6/5/1997 | P | PASS |
|
|
|
JEFF AT TV
|