Permanent Occupancy | | 12/17/1997 | 12/17/1997 | | DONE |
|
|
|
|
INSP - Final | 9/30/1997 | 9/30/1997 | 10/1/1997 | P | CANC |
Russ Owen
|
|
|
09/30/97 407 - Jim S,will do inspection.
|
INSP - Final | 9/30/1997 | 9/30/1997 | 9/30/1997 | | PASS |
Jim Storey
|
|
|
/ / 301 - FNL -OK FINAL card on site to be routed by owner.
|
INSP - Final | 9/24/1997 | 9/24/1997 | 9/24/1997 | P | CANC |
Russ Owen
|
|
|
09/24/97 407 - TRANSFER TO jiM s
|
INSP - Final | 9/23/1997 | 9/23/1997 | 9/23/1997 | P | CANC |
Russ Owen
|
|
|
09/23/97 407 - TRANSFER TO JIM S.
|
INSP-Final Inspection | 9/23/1997 | 9/23/1997 | 9/23/1997 | P | PASS |
Rick Jackson
|
|
|
all items on c/n corrected
|
INSP-Final Inspection | 9/3/1997 | 9/3/1997 | 9/3/1997 | P | PART |
Rick Jackson
|
|
|
occupied w/o c.o. training classes. tagged door w/ do not occupy temp occ ok. address not posted, no fe, hydrant too high
|
INSP - Final | 8/29/1997 | 8/29/1997 | 8/29/1997 | | FAIL |
Jim Storey
|
|
|
/ / 301 - OTH-OTHER AGENCIES NOT APPROVED fire,pw,achd and code inforcment.
|
INSP - Final | 8/29/1997 | 8/29/1997 | 8/29/1997 | P | CANC |
Russ Owen
|
|
|
08/29/97 407 - transfer to jim story.
|
INSP - Temporary occupancy | 8/12/1997 | 8/12/1997 | 8/12/1997 | P | FAIL |
Russ Owen
|
|
|
08/12/97 407 -
|
INSP - Final | 7/16/1997 | 7/17/1997 | 7/17/1997 | A | CANC |
Russ Owen
|
|
|
07/17/97 407 - TRANSFER TO 301
|
INSP - Framing/Rough-in | 7/17/1997 | 7/17/1997 | 7/17/1997 | | FAIL |
Jim Storey
|
|
|
/ / 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 7/10/1997 | 7/11/1997 | 7/11/1997 | A | CANC |
Russ Owen
|
|
|
contractor canceled.
|
INSP - Framing/Rough-in | 7/1/1997 | 7/1/1997 | 7/1/1997 | P | NR |
Russ Owen
|
|
|
07/01/97 407 - may need a special inspector for the welding also need a report for the massonry. also the steel roof joist plan has not been sta by engineer as required by plan check. and plumbing mechanical and elect have not been approv
|
INSP-Supply line flush | 4/28/1997 | 4/28/1997 | 4/28/1997 | A | PASS |
|
|
|
retest flush
|
INSP-Supply line flush | 4/25/1997 | 4/25/1997 | 4/25/1997 | P | FAIL |
|
|
|
restriners didnt hold, pouring thrust blocks, retest Mon am
|
INSP - Footings | 4/14/1997 | 4/15/1997 | 4/15/1997 | A | PASS |
|
|
|
REBAR
|
INSP - Footings | 4/14/1997 | 4/14/1997 | 4/14/1997 | | PASS |
|
|
|
04/15/97 333 - REBAR FTG -OK FOOTING
|