Permanent Occupancy | | 3/3/1998 | 3/3/1998 | | DONE |
|
|
|
|
INSP - Final | 2/27/1998 | 2/27/1998 | 2/27/1998 | | PASS |
|
|
|
/ / 338 - signed the occ req card other agencies approved
|
INSP - Final | 2/27/1998 | 2/27/1998 | 2/27/1998 | | PASS |
|
|
|
/ / 338 - signed the occ req card other agencies approved
|
INSP - Final | 6/11/1997 | 6/11/1997 | 6/11/1997 | P | FAIL |
|
|
|
06/11/97 338 - UNIT 100 not ready need temp signoff for the shell and co
|
INSP-Final Inspection | 6/10/1997 | 6/10/1997 | 6/10/1997 | P | PASS |
Joe Tawney
|
|
|
06/10/97 406 - REINSP FOR FINAL OK FOR PERM OCC
|
INSP-Final Inspection | 6/5/1997 | 6/5/1997 | 6/5/1997 | P | NR |
Joe Tawney
|
|
|
06/05/97 406 - NOT READY DOOR HDWRE NOT INSTALLED AND SHELL STILL NOT SI
|
INSP - Conference | 5/29/1997 | 5/29/1997 | 5/29/1997 | | PASS |
|
|
|
/ / 338 - with plan review on # of buildinge and the subdivision app r addressing
|
INSP - Temporary occupancy | 5/29/1997 | 5/29/1997 | 5/29/1997 | P | NR |
|
|
|
05/29/97 338 - may be final also. late p.m. unit 100 OTH-OTHER AGENCIES NOT APPROVED
|
INSP-Final Inspection | 5/29/1997 | 5/29/1997 | 5/29/1997 | P | FAIL |
Joe Tawney
|
|
|
05/29/97 406 - REINSP FOR FINAL FAILED SHELL STILL NOT SIGNED OFF EXIT D
|
INSP-Final Inspection | 5/27/1997 | 5/28/1997 | 5/28/1997 | A | NR |
Joe Tawney
|
|
|
05/28/97 406 - NOT READY SHELL NOT SIGNED OFF DOOR HDWRE SUITE NBR LETTE
|
INSP - Framing/Rough-in | 5/13/1997 | 5/13/1997 | 5/13/1997 | P | PASS |
|
|
|
05/13/97 338 - CEILING GRID verbal corr will check at the final
|
INSP - Framing/Rough-in | 4/7/1997 | 4/7/1997 | 4/6/1997 | P | NR |
|
|
|
04/07/97 338 - OUT OF TIME WILL DO # 2 04-08-97DDDDDDYYYYYYYYYY DONT SHO SHOULD THERE BE ONE?
|
INSP - Framing/ Rough-in | 4/6/1997 | 4/6/1997 | 4/6/1997 | | PASS |
|
|
|
/ / 338 - SUITE 100 FRAM-OK FRAMING
|