INSP - Letter of compliance | 8/26/1997 | 8/26/1997 | 8/26/1997 | | PASS |
|
|
|
/ / 338 - LCI-LETTER OF COMPLIANCE ISSUED # 13436
|
INSP - Occupancy Sign-off | 8/25/1997 | 8/26/1997 | 8/26/1997 | P | PASS |
|
|
|
/ / 338 - shell only SIGNED THE SHELL FOR FINAL MADE O
|
INSP-Final Inspection | 8/25/1997 | 8/26/1997 | 8/26/1997 | A | PASS |
Joe Tawney
|
|
|
08/26/97 406 - REINSP FOR FINAL OK FOR CERT OF COMPL
|
INSP-Final Inspection | 8/12/1997 | 8/12/1997 | 8/12/1997 | P | FAIL |
Joe Tawney
|
|
|
08/12/97 406 - FINAL ON SHELL FAIL BLDG ADDRESS HANDICAP RAMP PROTECTION
|
INSP - Framing/Rough-in | 6/25/1997 | 6/26/1997 | 6/26/1997 | A | PART |
|
|
|
06/26/97 338 - SHELL OK TO INSULATE
|
INSP - Footings | 4/28/1997 | 4/29/1997 | 4/29/1997 | A | PART |
Carl Dependahl
|
|
|
04/29/97 340 - FRONT COL FTGS OK
|
INSP - Footings | 4/10/1997 | 4/10/1997 | 4/9/1997 | P | PASS |
|
|
|
04/10/97 338 - P.M. (2 P.M.???) poured w/o insp to take pictures that t holdp
|
INSP - Foundation | 4/9/1997 | 4/9/1997 | 4/8/1997 | P | PASS |
|
|
|
04/09/97 338 - early pm. ok to cover the rear 75% of the foundation wal placed and the bulkheads are set
|
INSP - Footings | 4/7/1997 | 4/8/1997 | 4/7/1997 | A | PASS |
|
|
|
04/08/97 338 - FTG -OK FOOTING PAPERWORK TO FOLLOW
|
INSP - Footings | 4/7/1997 | 4/7/1997 | 4/6/1997 | P | NR |
|
|
|
04/07/97 338 - approved plans not on jobsite not ready r-bar not placed
|
INSP-Conference | 3/14/1997 | 3/14/1997 | 3/14/1997 | A | PASS |
|
|
|
visited site to check existing hydrants, existing hydrants satisfy fire flow requirements
|