INSP - Final | 6/26/1997 | 6/27/1997 | 6/27/1997 | A | PASS |
Jim Sly
|
|
|
06/26/97 316 - C/C # 13772
|
INSP - Letter of compliance | 6/27/1997 | 6/27/1997 | 6/27/1997 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 13772
|
INSP - Letter of compliance | 6/27/1997 | 6/27/1997 | 6/27/1997 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 13772
|
INSP - Final | 6/25/1997 | 6/26/1997 | 6/26/1997 | A | FAIL |
Jim Sly
|
|
|
06/25/97 316 - C/N..Need mech and elect final..and misc energy, add gyp
|
INSP - Framing/Rough-in | 5/8/1997 | 5/9/1997 | 5/9/1997 | P | PASS |
Jim Sly
|
|
|
05/09/97 316 - Inspection of shear wall garage rear....OK
|
INSP - Energy code compliance | 5/6/1997 | 5/7/1997 | 5/7/1997 | A | PASS |
Jim Sly
|
|
|
05/06/97 316 -
|
INSP - Framing/Rough-in | 5/6/1997 | 5/7/1997 | 5/7/1997 | A | PASS |
Jim Sly
|
|
|
05/06/97 316 -
|
INSP - Framing/Rough-in | 4/24/1997 | 4/24/1997 | 4/24/1997 | P | FAIL |
Jim Sly
|
|
|
04/24/97 316 - C/N...Need engineering garage fronts...
|
INSP - Framing/Rough-in | 4/21/1997 | 4/22/1997 | 4/22/1997 | A | FAIL |
Jim Sly
|
|
|
04/21/97 316 - C/N...Need mech and plumb rough ins.. garage front shear.
|
INSP - Footings | 2/25/1997 | 2/26/1997 | 2/26/1997 | A | PART |
Jim Sly
|
|
|
02/25/97 316 - NR....Height and soil appear OK....Told them to dbl and t ...Chevron pipeline runs close by....call Chevron if questions arise.
|