INSP - Final | 11/10/1997 | 11/10/1997 | 11/10/1997 | P | PASS |
Russ Owen
|
|
|
EARLY PM IF POSSIBLE/ REINSPECTION
|
INSP - Letter of compliance | 11/12/1997 | 11/10/1997 | 11/10/1997 | | PASS |
Russ Owen
|
|
|
LC#14009
|
INSP - Final | 11/7/1997 | 11/7/1997 | 11/7/1997 | P | FAIL |
Russ Owen
|
|
|
|
INSP - Masonry | 7/1/1997 | 7/1/1997 | 7/1/1997 | P | FAIL |
Russ Owen
|
|
|
07/01/97 407 - reinspection on a truss left correction
|
INSP - Masonry | 6/26/1997 | 6/26/1997 | 6/26/1997 | P | FAIL |
Russ Owen
|
|
|
06/26/97 407 - MASONRY FIREPLACE need a repair on truss from truss co. has been cut to accomodate. also n clearance at roof.
|
INSP - Energy code compliance | 5/30/1997 | 6/2/1997 | 6/2/1997 | P | PASS |
Russ Owen
|
|
|
06/02/97 407 - RE-INSPECT
|
INSP - Energy code compliance | 5/29/1997 | 5/30/1997 | 5/30/1997 | A | PART |
Russ Owen
|
|
|
05/30/97 407 - window installers have removed insulation above oval wind inspection ok.
|
INSP - Framing/Rough-in | 5/29/1997 | 5/30/1997 | 5/30/1997 | A | NR |
Russ Owen
|
|
|
05/30/97 407 - not ready did allow so sheetrock except where oval windows are and where lateral engineering was required at frame insp.
|
INSP - Framing/Rough-in | 5/22/1997 | 5/28/1997 | 5/29/1997 | A | FAIL |
Russ Owen
|
|
|
05/28/97 407 - ASAP 3 beams added to plan per TJI. truss repairs as per truss co.
|
INSP - Conference | 5/22/1997 | 5/23/1997 | 5/23/1997 | A | PART |
Russ Owen
|
|
|
|
INSP - Footings | 3/6/1997 | 3/7/1997 | 3/7/1997 | P | PASS |
Jim Storey
|
|
|
03/07/97 301 - FTG -OK FOOTING
|