INSP - Conference | 10/22/1997 | 10/22/1997 | 10/22/1997 | | PART |
Wes Worcester
|
|
|
/ / 342 - called Todd and he was not in office
|
INSP - Final | 10/21/1997 | 10/22/1997 | 10/22/1997 | A | NR |
Wes Worcester
|
|
|
10/22/97 342 - TODD ###-#### PLEASE CALL FIRST
|
INSP - Final | 10/22/1997 | 10/22/1997 | 10/22/1997 | | PASS |
Wes Worcester
|
|
|
/ / 342 - 4PM
|
INSP - Conference | 9/29/1997 | 9/29/1997 | 9/29/1997 | A | PASS |
Wes Worcester
|
|
|
CALLED KIM @ NO FRAME INSP OR SPECIAL INSP...4 HR, 1 HR, REBAR, GROUT NOT LOOKED AT
|
INSP - Conference | 9/29/1997 | 9/29/1997 | 9/29/1997 | A | PASS |
Wes Worcester
|
|
|
CALLED GEORGE @ ARCHITECT AND SPECIAL INSP NEED TO BE INVOLVED
|
INSP - Final | 9/26/1997 | 9/29/1997 | 9/29/1997 | A | FAIL |
Wes Worcester
|
|
|
Please call Tod at ###-#### first. no frame or special insp NEED ARCHITECT TO VERIFY DESIGN AND SPECIAL INSP REPORT
|
INSP - Final | 9/25/1997 | 9/26/1997 | 9/26/1997 | A | FAIL |
Rick Jackson
|
|
|
Please call Tod Weltner @ ###-#### before making the reinspection so he can meet you there. tamper on PIV didn't send signal to panel when closed
|
INSP - Final | 8/13/1997 | 8/15/1997 | 8/15/1997 | P | CANC |
|
|
|
duplicate entry
|
INSP-Sprinkler Rough-in/Hydro | 8/12/1997 | 8/15/1997 | 8/15/1997 | A | FAIL |
|
|
|
sprinkler alarms and corrections not done, c/n issued
|
INSP-Final Inspection | 8/11/1997 | 8/12/1997 | 8/12/1997 | P | NR |
|
|
|
|
INSP-Final Inspection | 8/8/1997 | 8/11/1997 | 8/11/1997 | P | CANC |
|
|
|
would like at 1 o'clock fire sprinkler final changed to 8/12/97
|
INSP-Sprinkler Rough-in/Hydro | 7/30/1997 | 7/31/1997 | 7/31/1997 | P | PART |
|
|
|
HYDRO TEST OK, NEED HIGH TEMP HEADS NEAR HEATERS, NEED BETTER PROTECTION FOR HEADS UNDER STAGE
|
INSP - Footings | 4/7/1997 | 4/7/1997 | 4/6/1997 | P | PASS |
|
|
|
04/07/97 333 - FTG -OK FOOTING
|