Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD97-00380
StatusExpired
Name BOISE HIGH SCHOOL
Site Address 519 N 9TH ST
Project NameBOISE HIGH MUSIC/GYM
Customer Number 
ePlanReviewNo
Description
BOISE HIGH SCHOOL * THE WORK SHALL CONSIST OF A NEW MECHANICAL BOILER AND FIRE SPRINKLER SYSTEM INSTALLATION FOR THE EXISTING MUSIC AND GYMNASIUM BUILDING AND INTERIOR IMPROVEMENTS PER APPROVED PLANS. ALL WORK IS PER PC#079-97, APPROVED PLANS AND ATTACHMENTS.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Conference10/22/199710/22/199710/22/1997 PART
DetailsWes Worcester
/ / 342 - called Todd and he was not in office
INSP - Final10/21/199710/22/199710/22/1997ANR
DetailsWes Worcester
10/22/97 342 - TODD ###-#### PLEASE CALL FIRST
INSP - Final10/22/199710/22/199710/22/1997 PASS
DetailsWes Worcester
/ / 342 - 4PM
INSP - Conference9/29/19979/29/19979/29/1997APASS
DetailsWes Worcester
CALLED KIM @ NO FRAME INSP OR SPECIAL INSP...4 HR, 1 HR, REBAR, GROUT NOT LOOKED AT
INSP - Conference9/29/19979/29/19979/29/1997APASS
DetailsWes Worcester
CALLED GEORGE @ ARCHITECT AND SPECIAL INSP NEED TO BE INVOLVED
INSP - Final9/26/19979/29/19979/29/1997AFAIL
DetailsWes Worcester
Please call Tod at ###-#### first. no frame or special insp NEED ARCHITECT TO VERIFY DESIGN AND SPECIAL INSP REPORT
INSP - Final9/25/19979/26/19979/26/1997AFAIL
DetailsRick Jackson
Please call Tod Weltner @ ###-#### before making the reinspection so he can meet you there. tamper on PIV didn't send signal to panel when closed
INSP - Final8/13/19978/15/19978/15/1997PCANC
Details
duplicate entry
INSP-Sprinkler Rough-in/Hydro8/12/19978/15/19978/15/1997AFAIL
Details
sprinkler alarms and corrections not done, c/n issued
INSP-Final Inspection8/11/19978/12/19978/12/1997PNR
Details
INSP-Final Inspection8/8/19978/11/19978/11/1997PCANC
Details
would like at 1 o'clock fire sprinkler final changed to 8/12/97
INSP-Sprinkler Rough-in/Hydro7/30/19977/31/19977/31/1997PPART
Details
HYDRO TEST OK, NEED HIGH TEMP HEADS NEAR HEATERS, NEED BETTER PROTECTION FOR HEADS UNDER STAGE
INSP - Footings4/7/19974/7/19974/6/1997PPASS
Details
04/07/97 333 - FTG -OK FOOTING