INSP - Final | 10/8/1997 | 10/8/1997 | 10/8/1997 | P | PASS |
Tom Arcoraci
|
|
|
ok for for final occ
|
INSP-Final Inspection | 7/17/1997 | 7/18/1997 | 7/18/1997 | A | PASS |
Joe Tawney
|
|
|
07/17/97 406 - REINSP FOR FINAL OK FOR PERM OCC
|
INSP - Final | 7/17/1997 | 7/18/1997 | 7/17/1997 | P | PASS |
|
|
|
07/18/97 338 - signed the final col
|
INSP - Final | 7/16/1997 | 7/17/1997 | 7/17/1997 | P | CANC |
|
|
|
|
INSP-Final Inspection | 7/16/1997 | 7/17/1997 | 7/17/1997 | A | CANC |
Joe Tawney
|
|
|
contractor canceled this. set up for friday
|
INSP - Final | 7/14/1997 | 7/14/1997 | 7/14/1997 | P | PART |
|
|
|
07/14/97 338 - signed the temp coll OTH-OTHER AGENCIES NOT APPROVED
|
INSP-Final Inspection | 7/14/1997 | 7/14/1997 | 7/14/1997 | P | PART |
Joe Tawney
|
|
|
07/14/97 406 - STRUCTURAL GOING OUT ON FINAL ALSO REINSP FOR FINAL OK FOR TEMP OCC STILL NEED MED GAS INST
|
INSP - Final | 7/11/1997 | 7/11/1997 | 7/11/1997 | P | NR |
Tom Arcoraci
|
|
|
|
INSP-Final Inspection | 7/11/1997 | 7/11/1997 | 7/11/1997 | P | FAIL |
Joe Tawney
|
|
|
07/11/97 406 - FINAL FAIL SUITE NBR MED GAS EQUIP NOT INSTALLED VENT NOT 1 HR SHAFT TEST EX & EMERG LIGHTS
|
INSP - Framing/Rough-in | 5/13/1997 | 5/14/1997 | 5/13/1997 | P | PASS |
|
|
|
05/14/97 338 - NORTH SIDE OF BUILDING
|