Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD97-00441
StatusFinaled
Name GARY CHRISTENSEN
Site Address 225 N 9TH ST
Project NameSEDGWICK CNTR-SHELL
Customer Number 
ePlanReviewNo
Description
9th & IDAHO BUILDING (SHELL AND CORE)* TO BUILD A NEW 90,260 SQ. FT., EIGHT STORY OFFICE AND RETAIL HIGH-RISE BUILDING WITH A 2750 SQ. FT. BASEMENT FOR MECHANICAL EQUIPMENT, AND A ROOF PENTHOUSE. THIS BUILDING WILL BE CONSTRUCTED OF A STEEL STRUCTURAL FRAME, MASONRY AND STEEL STUD EXTERIOR WALLS, CONCRETE OVER STEEL DECK FLOOR SYSTEMS AND METAL ROOF DECK WITH A CLASS "A" ROOFING SYSTEM. THIS BUIDLING WILL BE FULLY FIRE SPRINKLED. THE SPRINKLER SYSTEM IS BEING USED FOR ALLOWABLE AREA INCREASES. THIS IS A PERMIT FOR A SHELL AND CORE BUILDING ONLY; THERE IS NO OCCUPANCY ALLOWED UNDER THIS PERMIT. SEPARATE TENANT IMPROVEMENT PERMITS WILL BE REQUIRED TO FINISH EACH SEPARATE TENANT PORTION OF THIS BUILDING. THIS PERMIT ALSO INCLUDES RELATED SITE IMPROVEMENTS. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. CU-43-96/DR-117-96/PC#206-97/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/19/20001/20/20001/20/2000APASS
Details
Doors have been installed new exit stair 90 minut doors have been installed per approved plan l/c issued #18291 1/20/00 11:44:11 AM
INSP-Final Inspection5/11/19995/12/19995/12/1999PPART
DetailsRick Jackson
after 1/ Dennis ###-#### tested smoke control fans - okay for monitoring supervisory
INSP-Final Inspection5/4/19995/4/19995/4/1999PPART
DetailsRick Jackson
tested smoke evac system for the 8th, 4th and 3rd floors and all were okay
INSP-Conference4/21/19994/21/19994/21/1999PPART
DetailsRick Jackson
set up smoke evac certification for 4/27 3:30 pm
INSP-Conference4/19/19994/19/19994/19/1999PPART
DetailsRick Jackson
gave approval for smoke evac controls to electrical contractor and general contractor
INSP-Conference4/13/19994/13/19994/13/1999PPART
DetailsRick Jackson
approved smoke evac changes for control in FCC
INSP-Conference4/1/19994/1/19994/1/1999PPART
DetailsRick Jackson
requested diagram for smoke control in fire control room
INSP - Final3/26/19993/26/19993/26/1999P
Details
INSP-Final Inspection3/26/19993/26/19993/26/1999PPART
DetailsRick Jackson
smoke evac problems for high rise; knox box; NFPA 72;
INSP-Final Inspection3/25/19993/25/19993/25/1999AFAIL
DetailsRick Jackson
c/n items not complete
INSP-Alarm Testing3/24/19993/24/19993/24/1999PPART
DetailsRick Jackson
generator 2 hr test okay; alarms not programmed properly for notification; sprinkler alarms tested okay;
INSP-Alarm Testing3/19/19993/23/19993/23/1999AFAIL
DetailsRick Jackson
###-#### BOB//FIRE ALARM INSPECT elevators not ready; smoke evac controls not supervised; strobe in lobby not right cd; fire phones have static; labels on panel not correct
INSP-Final Inspection3/22/19993/23/19993/23/1999AFAIL
DetailsRick Jackson
###-#### SAM//FINAL FIRE core not complete; generator test; fan controls;
INSP - Framing/Rough-in3/22/19993/22/19993/22/1999APART
Details
03/22/99 338 - fire caulk made ok in the core area 2-8th
INSP - Framing/Rough-in3/16/19993/19/19993/19/1999PPART
Details
03/19/99 338 - core pressurization testing 1.5 hrs o.t.
INSP-Final Inspection3/19/19993/19/19993/19/1999PPART
DetailsRick Jackson
tested smoke evac system - retest several areas and after tenant spaces complete; door sweeps not on
INSP-Conference3/17/19993/17/19993/17/1999PPART
DetailsRick Jackson
discussed smoke evac test; checked water tank vent
INSP-Conference3/3/19993/3/19993/3/1999PPART
DetailsRick Jackson
profit meeting
INSP-Final Inspection3/1/19993/2/19993/2/1999APART
DetailsRick Jackson
03/02/99 409 - pump test will start at 10:00 pump test only - okay. will flow through test header and test standpipe
INSP-Conference3/1/19993/1/19993/1/1999PPART
DetailsRick Jackson
left corrrection notice for items from FV's inspection
INSP-Conference2/25/19992/25/19992/25/1999APART
DetailsRick Jackson
requirements for shell with Bob (gen contractor and TVFP)
INSP-Conference2/16/19992/16/19992/16/1999PPART
DetailsRick Jackson
conference for final occ requirements
INSP-Supply line flush2/4/19992/4/19992/4/1999PPASS
DetailsRick Jackson
SAM ###-#### PAGER underground flush okay
INSP - Framing/Rough-in2/3/19992/3/19992/3/1999P
Details
Scheduled by Hello!. Contact phone is [8591837].
INSP-Conference2/3/19992/3/19992/3/1999 PART
DetailsRick Jackson
/ / 409 - WALK THROUGH WITH PERRY AND CONTRACTOR
INSP - Framing/Rough-in1/15/19991/20/19991/20/1999PFAIL
DetailsWes Worcester
01/20/99 342 - Scheduled by Hello!. Contact phone is [8591837]. Perry
INSP - Framing/Rough-in1/12/19991/13/19991/13/1999APART
Details
01/13/99 338 - MADEOK ON WALK THROUGH WITH "BOB" THE SUPER LOOKED AT THE
INSP - Framing/Rough-in1/5/19991/6/19991/6/1999AFAIL
DetailsWes Worcester
01/06/99 342 - Scheduled by Hello!. NO CONTACT NUMBER, GIVEN TO KIM
INSP - Framing/Rough-in12/23/199812/28/199812/28/1998APART
Details
12/28/98 333 - core ok need shaft protection and beam protection at stai
INSP-Sprinkler Rough-in/Hydro12/15/199812/15/199812/15/1998PPART
DetailsRick Jackson
checked sheetrocking per L Smith request - all type x
INSP-Sprinkler Rough-in/Hydro12/9/199812/10/199812/10/1998APART
DetailsRick Jackson
SAM BALL PAGER ###-#### R/I okay to cover 1st floor lobby and all bathrooms. head still needed in the small utility room off 2nd floor bathrooms
INSP - Framing/Rough-in11/24/199811/25/199811/25/1998APART
Details
11/25/98 333 - bath on 12and 3
INSP - Framing/Rough-in11/13/199811/16/199811/16/1998AFAIL
Details
11/16/98 333 - conference on framing
INSP - Framing/Rough-in9/21/19989/21/19989/21/1998PPART
Details
first floor in progress
INSP - Framing/Rough-in9/1/19989/1/19989/1/1998PPART
Details
09/01/98 333 - resubmittal on firestopping approved
INSP - Framing/Rough-in8/18/19988/19/19988/19/1998PPART
Details
08/19/98 333 - review proposed 4hr wall detail
INSP - Framing/Rough-in8/3/19988/4/19988/4/1998PPART
Details
08/04/98 333 - firestopping and assemblies
INSP - Foundation7/28/19987/29/19987/29/1998APASS
Details
07/30/98 333 - FDN -OK FOUNDATION
INSP - Foundation7/3/19987/3/19987/3/1998P
Details
Scheduled by Hello!. Contact phone is [8591837].
INSP - Foundation6/22/19986/22/19986/22/1998 PART
Details
/ / 333 - GRADE BEAMS ON SOUTH WALL OK PEND SPECIAL INSP REPORT
INSP - Foundation6/10/19986/10/19986/10/1998PPART
Details
06/10/98 333 - grade beams north side
INSP - Foundation6/9/19986/9/19986/9/1998 PART
Details
/ / 333 - GRADE BEAMS IN PROGRESS
INSP - Foundation6/8/19986/8/19986/8/1998 PART
Details
/ / 333 - GRADE BEAMS IN PROGRESS
INSP - Foundation6/3/19986/3/19986/3/1998PPART
Details
06/03/98 333 - fdn east wall ok
INSP - Foundation5/27/19985/27/19985/27/1998 PART
Details
/ / 333 - FDN WALLS OK
INSP - Foundation5/26/19985/26/19985/26/1998 PART
Details
/ / 333 - CASON CAPS OK
INSP - Foundation5/19/19985/19/19985/19/1998 PART
Details
/ / 333 - CASONS SOUTH ESAT SIDE OK
INSP - Foundation5/15/19985/15/19985/15/1998 PART
Details
/ / 333 - caps ok
INSP - Foundation5/13/19985/13/19985/13/1998 PART
Details
/ / 333 - PIER CAPS ON NORTH SIDE OK PEND SPEC INSP REPORTS
INSP - Foundation5/12/19985/12/19985/12/1998APART
Details
05/12/98 333 - west wall ok
INSP - Foundation5/7/19985/7/19985/7/1998APART
Details
05/07/98 333 - west fdn ok pending special insp reports
INSP - Foundation5/4/19985/4/19985/4/1998 PART
Details
05/04/98 333 - ok pending special insp reports
INSP - Foundation4/29/19984/30/19984/30/1998APART
Details
04/30/98 333 - ok pending special insp reports
INSP - Foundation4/27/19984/27/19984/27/1998 PART
Details
/ / 333 - OK PENDING SPECIAL INSP REPORTS
INSP - Foundation4/19/19984/20/19984/20/1998APART
Details
04/20/98 333 - pending special insp reports
INSP - Concrete4/16/19984/16/19984/16/1998 PART
Details
04/16/98 333 - pre con meeting
INSP - Foundation4/15/19984/15/19984/15/1998 PART
Details
/ / 333 - OK PENDING SPECIAL INSP REPORT
INSP - Conference4/13/19984/13/19984/13/1998 PASS
Details
/ / 333 - pre con meeting
INSP - Foundation4/10/19984/10/19984/10/1998PPART
Details
ok pend special insp report
INSP - Foundation4/8/19984/8/19984/8/1998PPART
Details
ok pending special insp report
INSP - Foundation4/8/19984/8/19984/8/1998 PART
Details
04/08/98 333 - ok pend spec insp report###-####
INSP - Foundation4/6/19984/7/19984/7/1998APART
Details
04/07/98 333 - ok pend spec insp report
INSP - Foundation4/1/19984/2/19984/2/1998PPART
Details
04/02/98 333 - CASONS OK PENDING SPEC INSP REPORT
INSP - Foundation3/31/19984/1/19984/1/1998PPART
Details
04/01/98 333 - pending special insp report
INSP - Foundation3/30/19983/31/19983/31/1998APART
Details
03/31/98 333 - ksons ok pend spec ins report
INSP - Foundation3/30/19983/30/19983/30/1998PPART
Details
03/30/98 333 - FOOTING ok pend spes insp report
INSP - Foundation3/17/19983/17/19983/17/1998 PART
Details
/ / 333 - PRECON W / BOB T AND MTI