Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberBLD97-00455
StatusFinaled
Name ADA COUNTY (SHERIFFS INMATE HOUSING)
Site Address 7200 W BARRISTER DR
Project NameADA COUNTY JAIL
Customer Number 
ePlanReviewNo
Description
ADA COUNTY SHERIFF'S INMATE HOUSING * TO CONSTRUCT A NEW SINGLE STORY, CMU EXTERIOR WALL, TYPE V NONRATED, FULLY FIRE SPRINKLERED, 5,416 SQ. FT. INMATE HOUSING FACILITY WITH EXTERIOR EXCERCISE AREA FOR THE ADA COUNTY SHERIFF'S OFFICE, INCLUDED WITHIN THIS PERMIT IS RELATED SITE IMPROVEMENTS AS SHOWN ON THE PLANS. MJP (PC#105-97) DR#1-97/7200 CU#88-96
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final10/29/199710/29/199710/29/1997PPASS
Details
SIGNED THE OCC REQ CARD FINAL PERM COLUMN
Permanent Occupancy 10/29/199710/29/1997 DONE
Details
Permanent Occupancy 10/29/199710/29/1997 DONE
Details
INSP-Final Inspection10/24/199710/27/199710/27/1997APASS
DetailsJoe Tawney
10/27/97 406 - SCHEDULED FOR 8:30 REINSP FOR FINAL OK FOR PERM OCC
INSP-Final Inspection10/8/199710/9/199710/9/1997AFAIL
DetailsJoe Tawney
10/09/97 406 - FINAL FAIL ALARM SYSTEM SPKLR HEAD FIRE EXT
INSP-Sprinkler Rough-in/Hydro10/2/199710/2/199710/2/1997 PART
DetailsJoe Tawney
/ / 406 - OK ON HYDRO TEST FOR DPV SPKLR SYSTEM
INSP-Supply line flush9/5/19979/5/19979/5/1997 PART
DetailsJoe Tawney
/ / 406 - OK ON UNDERGROUND FLUSH
INSP-Supply line flush9/5/19979/5/19979/5/1997 PART
DetailsJoe Tawney
/ / 406 - OK ON UNDERGROUND FLUSH
INSP - Framing/Rough-in9/3/19979/4/19979/4/1997APASS
Details
09/04/97 338 - CEILING
INSP - Framing/Rough-in8/28/19978/29/19978/29/1997APART
Details
08/29/97 338 - AFTER 10:00-METAL STUD VERBAL CORRECTIONS i NEED ASSEMBLI PENETRATIONS OF THE 1-HOUR CEILING ASSY IN THE MEC ROOM
INSP - Framing/Rough-in8/26/19978/27/19978/28/1997APASS
Details
08/27/97 338 - steel stud framing ceiling frame ok
INSP - Framing/Rough-in8/11/19978/11/19978/11/1997PPASS
Details
08/11/97 338 - OTH-OTHER AGENCIES NOT APPROVED ok to cover after heating signoff
INSP-Sprinkler Rough-in/Hydro8/8/19978/8/19978/8/1997 PART
OK ON HYDRO TEST OF UNDERGROUND FDC
INSP-Sprinkler Rough-in/Hydro7/29/19977/30/19977/30/1997APART
DetailsJoe Tawney
07/30/97 406 - SPKLR ROUGH IN OK TO COVER ONE DP SYSTEM
INSP - Framing/Rough-in7/14/19977/14/19977/14/1997 NR
Details
/ / 338 - reinspection from 07-14-97 OTH-OTHER AGENCIES NOT APPROVED
INSP - Framing/Rough-in7/14/19977/14/19977/14/1997PNH
Details
07/14/97 338 - 6:pm out of time
INSP - Framing/Rough-in7/10/19977/11/19977/11/1997APART
DetailsJim Storey
07/11/97 301 - FRAMING ROOF CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Masonry6/27/19976/27/19976/27/1997PPASS
Details
06/27/97 338 - made ok with sp insp blessingF.Y.I. SPECIAL INSPECTOR ON AT 11 A.M.
INSP - Masonry6/25/19976/26/19976/26/1997APASS
Details
06/26/97 338 - GROUTING 9:30 AM made ok with sp insp ok
INSP - Masonry6/24/19976/25/19976/25/1997APASS
Details
06/25/97 338 - GROUT POURING GROUT AT 8 A.M.made ok MASN-REBAR OK
INSP - Site Preparation6/20/19976/23/19976/23/1997APASS
Details
06/23/97 338 - I didn't know what to put this under so he is pouring gro know if you needed to stop by!AJC made ok with sp insp approval
INSP - Masonry6/19/19976/19/19976/19/1997PPASS
Details
06/19/97 338 - masonry grout - pumping at 8 a.m. forgot to call Wed. MASN-REBAR OK ON JOB. made ok with sp insp approval r-bar is placed
INSP - Foundation5/20/19975/20/19975/19/1997PPASS
Details
05/20/97 333 - stem walls 2 o'clock pouring
INSP - Footings5/19/19975/19/19975/19/1997PPASS
Details
05/20/97 333 - FTG -OK FOOTING
INSP - Footings5/16/19975/16/19975/16/1997PPASS
Details
05/16/97 338 - madeok ok to cut off the verts to pour the slab per the a insp for the drill and epoxy of the extensions after the slab
INSP - Foundation5/2/19975/2/19975/2/1997PPART
DetailsCarl Dependahl
05/02/97 340 - FDN INSUL INPLACE; PENDING SPEC INSP REPORT, LOOKS OK
INSP - Foundation4/30/19974/30/19974/30/1997PCANC
DetailsCarl Dependahl
FOUNDATION STEM WALL. POURING AT 3 P.M./CANCELED INSPECTION, TO MUDDY.
INSP - Footings4/28/19974/29/19974/29/1997PPART
DetailsCarl Dependahl
04/29/97 340 - IF THEY HAVE TIME WILL DO STEM WALL ALSO...MTI ONSITE, PE
INSP - Conference4/28/19974/28/19974/28/1997 PASS
DetailsCarl Dependahl
/ / 340 - HAD QUICK PRE-CON W/ DALE, ONSITE SUPT. & TROY, MTI SPEC INS
INSP - Footings4/28/19974/28/19974/28/1997PPASS
DetailsCarl Dependahl
04/28/97 340 - POURING AT 3 P.M. FORM & STEEL OK