INSP - Final | 6/9/1997 | 6/11/1997 | 6/11/1997 | P | PASS |
Jim Sly
|
|
|
06/10/97 316 - C/C # 13342
|
INSP - Letter of compliance | 6/11/1997 | 6/11/1997 | 6/11/1997 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 13342
|
INSP - Letter of compliance | 6/11/1997 | 6/11/1997 | 6/11/1997 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 13342
|
INSP - Conference | 6/9/1997 | 6/9/1997 | 6/9/1997 | | PASS |
|
|
|
Volute made ok.
|
INSP - Final | 6/5/1997 | 6/6/1997 | 6/6/1997 | P | FAIL |
Jim Sly
|
|
|
06/06/97 316 - C/N...need elec, mech, plumb finals and Misc to many to l
|
INSP - Framing/Rough-in | 5/23/1997 | 5/27/1997 | 5/27/1997 | P | PASS |
Jim Sly
|
|
|
05/27/97 316 - Way past framing stage....Framing OK'd previously...
|
INSP - Energy code compliance | 5/8/1997 | 5/9/1997 | 5/8/1997 | A | PASS |
Jim Sly
|
|
|
05/08/97 316 -
|
INSP - Framing/Rough-in | 5/8/1997 | 5/9/1997 | 5/8/1997 | A | PASS |
Jim Sly
|
|
|
05/08/97 316 - REIN
|
INSP - Framing/Rough-in | 5/5/1997 | 5/6/1997 | 5/6/1997 | A | FAIL |
Jim Sly
|
|
|
05/05/97 316 - C/N...Misc framing...
|
INSP - Footings | 3/25/1997 | 3/25/1997 | 3/25/1997 | P | PART |
Jim Sly
|
|
|
03/25/97 316 - Poured W/O inspection.....soil and height OK...Setbacks?? on site..Odd lot.
|