INSP - Final | 8/8/1997 | 8/8/1997 | 8/8/1997 | P | CANC |
Jim Sly
|
|
|
08/08/97 316 - Gave to Tom A.
|
INSP - Final | 8/8/1997 | 8/8/1997 | 8/8/1997 | P | NR |
Tom Arcoraci
|
|
|
|
INSP - Energy code compliance | 5/5/1997 | 5/6/1997 | 5/6/1997 | A | PASS |
Jim Sly
|
|
|
05/05/97 316 -
|
INSP - Framing/Rough-in | 5/1/1997 | 5/2/1997 | 5/2/1997 | P | PASS |
Jim Sly
|
|
|
05/02/97 316 - FRAME REINSPECT OK
|
INSP - Framing/Rough-in | 4/30/1997 | 5/1/1997 | 5/1/1997 | A | FAIL |
Jim Sly
|
|
|
04/30/97 316 - C/N...Need air infiltration.....
|
INSP - Footings | 3/10/1997 | 3/11/1997 | 3/11/1997 | A | PART |
Jim Sly
|
|
|
03/10/97 316 - Footing into the 20' setback from radius (street)....Cont wall will be at 20' and not protrude into setback...Soil and height OK
|