Permanent Occupancy | | 9/15/1997 | 9/15/1997 | | DONE |
|
|
|
|
INSP-Final Inspection | 5/30/1997 | 5/30/1997 | 6/2/1997 | P | PASS |
Joe Tawney
|
|
|
05/30/97 406 - REINAP FOR FINAL OK FOR PERM OCC
|
INSP - Conference | 5/30/1997 | 5/30/1997 | 5/30/1997 | | PASS |
|
|
|
/ / 338 - contractor rescheduled til this p.m.
|
INSP - Conference | 5/30/1997 | 5/30/1997 | 5/30/1997 | | PASS |
|
|
|
/ / 338 - contractor rescheduled til this p.m.
|
INSP - Final | 5/29/1997 | 5/30/1997 | 5/30/1997 | A | PART |
|
|
|
05/30/97 338 - signed for the temp col
|
INSP-Final Inspection | 5/29/1997 | 5/29/1997 | 5/29/1997 | P | FAIL |
Joe Tawney
|
|
|
05/29/97 406 - FINAL FAIL THUMB TURN ESCUCHEONS ON SPKLR HDS DOOR HDWRE PROTECTION IN FREEZER OVER SPRAY ON SPKLR HD
|
INSP - Framing/Rough-in | 5/2/1997 | 5/5/1997 | 5/5/1997 | P | PASS |
|
|
|
05/05/97 338 - MADE OK
|
INSP - Framing/Rough-in | 5/1/1997 | 5/2/1997 | 5/2/1997 | P | NR |
Carl Dependahl
|
|
|
05/02/97 340 - NR, RECALL FOR MONDAY
|