INSP - Final | 6/5/1997 | 6/5/1997 | 6/5/1997 | P | PASS |
Carl Dependahl
|
|
|
/ / 340 - final reinspect
|
INSP - Letter of compliance | 6/5/1997 | 6/5/1997 | 6/5/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - LC 11701
|
INSP - Letter of compliance | 6/5/1997 | 6/5/1997 | 6/5/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - LC 11701
|
INSP - Final | 6/4/1997 | 6/4/1997 | 6/4/1997 | P | FAIL |
Carl Dependahl
|
|
|
06/04/97 340 - FAIL, SEAL GAS PIPE,VAPOR BARRIER
|
INSP - Framing/Rough-in | 4/23/1997 | 4/23/1997 | 4/22/1997 | P | PART |
|
|
|
04/23/97 333 - FRAM-OK FRAMING except south wall cn #6 not made
|
INSP - Framing/Rough-in | 4/21/1997 | 4/22/1997 | 4/22/1997 | P | PART |
Alan Hauser
|
|
|
04/22/97 350 - corrections on frame, posted (2 copies), ok to insulate
|
INSP - Footings | 3/19/1997 | 3/19/1997 | 3/19/1997 | P | PASS |
Alan Hauser
|
|
|
03/19/97 350 - ftns ok, setbacks ok
|