Permit NumberBLD97-00585
StatusFinaled
Name WEST JR. HIGH SCHOOL
Site Address 711 N CURTIS RD
Project NameWEST JR. HIGH
Customer Number 
ePlanReviewNo
Description
WEST JR. HIGH SCHOOL REMODEL AND ADDITION. WORK INCLUDES NEW ROOFING ON THE CAFETERIA AND GYM WITH A NEW ROOF OVER BUILD ON THE MAIN BUILDING, NEW CANOPY ADDITION TO THE CAFETERIA, REMODELED CEILINGS IN THE CORRIDOR OF THE MAIN BUILDING, NEW EIFS EXTERIOR FINISH, NEW VENTIALTION SYSTEM IN NORTH END OF THE MAIN BUILDING, ADDING COLUMNS NEW CEILING WITH FIRE DAMPERS TO GYM WITH A NEW TWO-HOUR AREA WALL BETWEEN GYM AND MAIN BUILDING AND TO FULLY FIRE SPRINKLER THE BUILDING. OTHER WORK INCLUDES ALL REALTED DEMOLITION OF CANOPIES, CEILINGS AND ROOFING AND A NEW FIRE LANE AND ALL OTHER REALTED SITE WORK. FIRE SPRINKLERS AT THE CAFETERIA ARE USED FOR ONE-HOUR CONSTRUCTION. APPROVED PLANS AND ATTACHMENTS. PC#127-97
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final12/23/199712/24/199712/24/1997APASS
Details
12/24/97 338 - WEST JR HIGH FNL -OK FINAL CORRECTIONS REMOVED
INSP - Framing/Rough-in12/19/199712/22/199712/22/1997PPART
Details
12/22/97 338 - verbal corrections need thresholds on the 1.5 hour doors seals for same misc firecaulking etc
INSP-Final Inspection12/19/199712/22/199712/22/1997APASS
DetailsJoe Tawney
12/22/97 406 - PAGE ART ###-#### REINSP FOR FINAL OK FOR PERM OCC OR LETTER OF COMPLETION
INSP-Final Inspection12/9/199712/9/199712/9/1997PPART
DetailsRick Jackson
WEST JR HIGH reinspect of tampers and smoke damper - passed. awaiting low air alarm.
INSP - Final12/2/199712/3/199712/4/1997PCANC
Details
12/03/97 338 - out of time contractor is to call for inspection when rea
INSP-Final Inspection12/2/199712/3/199712/3/1997AFAIL
DetailsJoe Tawney
12/03/97 406 - WEST JR HIGH REINSP FOR FINAL FAIL S/F DAMPER CONTROL VALVE SUPRV AIR PRESSURE SUPR
INSP - Final12/1/199712/2/199712/2/1997PCANC
Details
###-#### PAGE ART BEFORE GOING OUT cont. called said it was for this pm. well it is not. but i canc. it anyway
INSP-Final Inspection12/2/199712/2/199712/2/1997PFAIL
DetailsJoe Tawney
12/02/97 406 - WEST JR HIGH/ WOULD LIKE AROUND 2:00 REINSP FOR FINAL FAIL SMOKE/FIRE DAMPER FAILED TO OPERATE
INSP - Final11/26/199711/26/199711/26/1997 FAIL
DetailsJoe Tawney
/ / 406 - TESTED SPKLR ALARMS ON 3 BLDGS MAIN BLDG & CAFETERIA FAILED
INSP - Carpentry11/25/199711/25/199711/25/1997PFAIL
DetailsWes Worcester
11/25/97 342 - smk seals, fire dept final, draft stop penetrations and n penetrations, nailing and blow patch seal nailing..
INSP-Sprinkler Rough-in/Hydro11/25/199711/25/199711/25/1997 FAIL
DetailsJoe Tawney
/ / 406 - INSTALL ROW OF HEADS IN ATTIC NORTH /SOUTH WALKWAY
INSP - Final11/12/199711/12/199711/12/1997PCANC
Details
canc by the builder
INSP-Final Inspection11/12/199711/12/199711/12/1997PPART
DetailsJoe Tawney
11/12/97 406 - REINSP OF INSTALLATION OF SPKLRS OK EXCEPT 2 AREAS
INSP-Final Inspection11/4/199711/4/199711/5/1997PNR
DetailsJoe Tawney
11/04/97 406 - NOT READY FOR FINAL
INSP - Final11/4/199711/4/199711/4/1997PFAIL
Details
11/04/97 333 - OTH-OTHER AGENCIES NOT APPROVED
INSP-Sprinkler Rough-in/Hydro10/28/199710/28/199710/28/1997 FAIL
DetailsJoe Tawney
/ / 406 - CONTINUED ROUGH IN INSP COMPILED LIST OF DEFICIENCIES ON ALL
INSP-Sprinkler Rough-in/Hydro10/27/199710/27/199710/27/1997 FAIL
DetailsJoe Tawney
/ / 406 - DRY SYSTEMS SPKLR RIUGH IN FAIL ALSO TRIP TESTED LARGE SYSTE SYSTEMS
INSP - Final10/23/199710/23/199710/23/1997 FAIL
DetailsJoe Tawney
/ / 406 - TRIP TEST ON DP SYSTEMS LARGER SYSTEM FAILED 60 SEC WATER TO
INSP-Sprinkler Rough-in/Hydro10/21/199710/22/199710/22/1997APART
DetailsJoe Tawney
10/22/97 406 - WEST JR HIGH OK ON HYDRO TESTS OF 2 WET & 2 DRY SYSTEMS STILL NEED TO HYDRO TEST FDC
INSP - Framing/Rough-in10/2/199710/2/199710/2/1997PPASS
Details
10/02/97 338 - roof nailing made ok
INSP - Framing/Rough-in10/1/199710/1/199710/2/1997PNR
Details
10/02/97 338 - canclled by the contractor
INSP - Final9/25/19979/25/19979/25/1997 PASS
Details
/ / 338 - not ready OTH-OTHER AGENCIES NOT APPROVED need p/z and achd ally ok
INSP - Framing/Rough-in9/25/19979/25/19979/25/1997 PASS
Details
/ / 338 - rof sheathing madeok ok to drysheath
INSP - Framing/Rough-in9/25/19979/25/19979/25/1997 PASS
Details
/ / 338 - rof sheathing madeok ok to drysheath
INSP - Framing/Rough-in9/16/19979/16/19979/16/1997PPART
Details
09/16/97 338 - AROUND 1 OR 2 IF YOU CAN MAKE IT misc roof sheathing nail
INSP - Framing/Rough-in9/15/19979/16/19979/16/1997ANR
Details
09/16/97 338 - as early a.m. as possible not ready
INSP - Framing/Rough-in9/16/19979/16/19979/16/1997 NR
Details
/ / 338 - not ready did not call to cancell
INSP - Framing/Rough-in9/3/19979/3/19979/3/1997PFAIL
Details
09/03/97 338 - C/N ISSUED NEED JOINT TREATMENT PER CORRECTION NOTICE
INSP - Carpentry8/29/19978/29/19978/29/1997 PASS
Details
/ / 338 - east side ready for the tapingROOF LINE THROUGH THE NEW ATTI
INSP - Wall cover8/29/19978/29/19978/29/1997PPASS
Details
08/29/97 338 - 2 hr . wall on the roof PART MADE OK
INSP-Sprinkler Rough-in/Hydro8/28/19978/28/19978/28/1997 PART
DetailsJoe Tawney
/ / 406 - OK ON ROUGH IN OF FRONT CANOPY INSP BY RICK
INSP - Framing/Rough-in8/27/19978/27/19978/28/1997PNR
Details
08/27/97 338 - other agencies nt approved
INSP - Temporary occupancy8/25/19978/25/19978/25/1997PFAIL
Details
08/25/97 338 - 1 o'clock no access to the occ req card
INSP - Final8/22/19978/22/19978/22/1997PPART
Details
08/22/97 338 - temp to be signed monday
INSP-Final Inspection8/22/19978/22/19978/22/1997PNR
DetailsJoe Tawney
08/22/97 406 - FINAL NOT READY FOR FINAL
INSP-Sprinkler Rough-in/Hydro8/22/19978/22/19978/22/1997 PART
OK ON HYDRO TEST FOR CAFETERIA
INSP - Framing/Rough-in8/20/19978/20/19978/21/1997PCANC
DetailsJim Sly
08/21/97 316 - Gave to P Paine. roof 2hr wall ready at 4:00
INSP - Conference8/18/19978/18/19978/18/1997 PASS
Details
/ / 338 - on th e extension of the 2-hour wall
INSP - Wall cover8/18/19978/18/19978/18/1997 PASS
Details
08/18/97 338 - 2 HR WALL CONFERENCE part made ok on the upper section wi 08-19-97 my call
INSP - Wall cover8/18/19978/18/19978/18/1997 PASS
Details
08/18/97 338 - 2 HR WALL CONFERENCE part made ok on the upper section wi 08-19-97 my call
INSP - Framing/Rough-in8/13/19978/14/19978/14/1997APASS
Details
08/14/97 338 - FRAMING ON ROOF
INSP-Supply line flush8/13/19978/13/19978/13/1997 PART
DetailsJoe Tawney
/ / 406 - OK ON UNDERGROUND FLUSH
INSP - Framing/Rough-in8/1/19978/4/19978/4/1997APASS
DetailsRuss Owen
08/04/97 407 - ROOF NAILING
INSP-Sprinkler Rough-in/Hydro7/30/19977/31/19977/31/1997APART
DetailsJoe Tawney
07/31/97 406 - SPKLR ROUGH IN OF CORRIDORS IN MAIN BLDG OK TO COVER
INSP-Supply line flush7/31/19977/31/19977/31/1997 PART
DetailsJoe Tawney
/ / 406 - OK ON UNDERGROUND FLUSH
INSP - Ceiling grid7/29/19977/30/19977/30/1997APART
Details
07/30/97 338 - partial made ok 07-28-97
INSP - Framing/Rough-in7/29/19977/30/19977/30/1997APART
Details
07/30/97 338 - partial ok on th roof decking
INSP - Framing/Rough-in7/23/19977/24/19977/24/1997APASS
Details
07/24/97 338 - LATE MORNING NAILING 100 FT SECTION OF THE ROOF DECK NAILING OF THE CEILING IN THE GYM
INSP - Framing/Rough-in7/23/19977/23/19977/22/1997PCANC
Details
07/23/97 338 - ROOF NAILINGcancelled by Art/superint. recalled for 07-24
INSP - Wall cover7/18/19977/18/19977/17/1997PPART
Details
07/18/97 338 - FIRE WALL NAILING nailing is ok still need the fire caulk all but the perimetet above which will be fire caulked assys still to co
INSP - Framing/Rough-in7/17/19977/17/19977/17/1997PPART
DetailsWes Worcester
DRYWALL 1st layer 2 hr wall on corridor side ok. ok to put on 1st layer and replace one broken piece of sheetrock, need eng for cable tray penetration at end of corridor wall.
INSP - Framing/Rough-in7/16/19977/16/19977/17/1997PPART
Details
07/16/97 338 - done by 342
INSP - Framing/Rough-in7/16/19977/16/19977/16/1997PNR
DetailsWes Worcester
no one on site, couldn't find wall that needed inspection
INSP - Framing/Rough-in7/14/19977/15/19977/15/1997APART
Details
07/15/97 338 - partial ok first layer on the 2-hr not ready
INSP - Conference7/10/19977/10/19977/10/1997 PASS
Details
/ / 338 - ctr called to cancell insp til late p.m.
INSP - Framing/Rough-in7/9/19977/10/19977/10/1997APART
Details
/ / 338 - partial roof nailing only arch to inspect al FDN -OK FOUNDATION
INSP - Framing/Rough-in7/3/19977/7/19977/7/1997ANR
Details
07/07/97 338 - nr
INSP - Wall cover7/2/19977/3/19977/3/1997PNR
Details
07/03/97 338 - FIRE WALL
INSP - Wall cover7/2/19977/2/19977/3/1997PCANC
Details
07/02/97 338 - 2 hour fire wall contractor cancelled til tomorrow
INSP - Framing/Rough-in6/30/19977/1/19977/1/1997AFAIL
Details
07/01/97 338 - c/n issued on the 2-hour wall
INSP - Carpentry6/25/19976/26/19976/26/1997APASS
Details
06/26/97 338 - ROOF NAILING mate ok for next 100 ft to the east at the s
INSP - Conference6/26/19976/26/19976/26/1997 PASS
Details
/ / 338 - WITH BLANKER NEED 2 LAYERS TOTAL FOR THE 5/8 GYP ON THE GYM APPROVED PLAN MUST REPAIR ALL ACCESS CUTR OUTS IN THE EXISTING TO RUN EL
INSP - Conference6/25/19976/26/19976/26/1997APASS
Details
06/26/97 338 - made ok on the 2-hour wall exeption submittall recieved a
INSP - Resubmittals6/26/19976/26/19976/26/1997 PASS
Details
/ / 338 - recieved, reviewed resubmittal for 2-hour equilv. foe 1/2" g and 5/8" gyp over same at existing wall resubs will be attached to file drawings
INSP - Framing/Rough-in6/23/19976/24/19976/24/1997APASS
Details
06/24/97 338 - roof sheathing on the s.w. 100 ft +-
INSP - Framing/Rough-in6/18/19976/19/19976/19/1997APART
Details
06/19/97 338 - ROOF NAILING nailing ok c/n issued on the lateral support rquirements and nail size descrepancies
INSP - Conference6/17/19976/17/19976/17/1997 PASS
Details
/ / 338 - QUESTIONS ON THE 2 HOUR WALL ASSY IN THE MAIN CORRIDOR INSID
INSP - Framing/Rough-in6/16/19976/17/19976/17/1997ANR
Details
06/17/97 338 - NOT A FRAME INSP IT IS A CONFERENCE