INSP - Final | 12/23/1997 | 12/24/1997 | 12/24/1997 | A | PASS |
|
|
|
12/24/97 338 - WEST JR HIGH FNL -OK FINAL CORRECTIONS REMOVED
|
INSP - Framing/Rough-in | 12/19/1997 | 12/22/1997 | 12/22/1997 | P | PART |
|
|
|
12/22/97 338 - verbal corrections need thresholds on the 1.5 hour doors seals for same misc firecaulking etc
|
INSP-Final Inspection | 12/19/1997 | 12/22/1997 | 12/22/1997 | A | PASS |
Joe Tawney
|
|
|
12/22/97 406 - PAGE ART ###-#### REINSP FOR FINAL OK FOR PERM OCC OR LETTER OF COMPLETION
|
INSP-Final Inspection | 12/9/1997 | 12/9/1997 | 12/9/1997 | P | PART |
Rick Jackson
|
|
|
WEST JR HIGH reinspect of tampers and smoke damper - passed. awaiting low air alarm.
|
INSP - Final | 12/2/1997 | 12/3/1997 | 12/4/1997 | P | CANC |
|
|
|
12/03/97 338 - out of time contractor is to call for inspection when rea
|
INSP-Final Inspection | 12/2/1997 | 12/3/1997 | 12/3/1997 | A | FAIL |
Joe Tawney
|
|
|
12/03/97 406 - WEST JR HIGH REINSP FOR FINAL FAIL S/F DAMPER CONTROL VALVE SUPRV AIR PRESSURE SUPR
|
INSP - Final | 12/1/1997 | 12/2/1997 | 12/2/1997 | P | CANC |
|
|
|
###-#### PAGE ART BEFORE GOING OUT cont. called said it was for this pm. well it is not. but i canc. it anyway
|
INSP-Final Inspection | 12/2/1997 | 12/2/1997 | 12/2/1997 | P | FAIL |
Joe Tawney
|
|
|
12/02/97 406 - WEST JR HIGH/ WOULD LIKE AROUND 2:00 REINSP FOR FINAL FAIL SMOKE/FIRE DAMPER FAILED TO OPERATE
|
INSP - Final | 11/26/1997 | 11/26/1997 | 11/26/1997 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - TESTED SPKLR ALARMS ON 3 BLDGS MAIN BLDG & CAFETERIA FAILED
|
INSP - Carpentry | 11/25/1997 | 11/25/1997 | 11/25/1997 | P | FAIL |
Wes Worcester
|
|
|
11/25/97 342 - smk seals, fire dept final, draft stop penetrations and n penetrations, nailing and blow patch seal nailing..
|
INSP-Sprinkler Rough-in/Hydro | 11/25/1997 | 11/25/1997 | 11/25/1997 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - INSTALL ROW OF HEADS IN ATTIC NORTH /SOUTH WALKWAY
|
INSP - Final | 11/12/1997 | 11/12/1997 | 11/12/1997 | P | CANC |
|
|
|
canc by the builder
|
INSP-Final Inspection | 11/12/1997 | 11/12/1997 | 11/12/1997 | P | PART |
Joe Tawney
|
|
|
11/12/97 406 - REINSP OF INSTALLATION OF SPKLRS OK EXCEPT 2 AREAS
|
INSP-Final Inspection | 11/4/1997 | 11/4/1997 | 11/5/1997 | P | NR |
Joe Tawney
|
|
|
11/04/97 406 - NOT READY FOR FINAL
|
INSP - Final | 11/4/1997 | 11/4/1997 | 11/4/1997 | P | FAIL |
|
|
|
11/04/97 333 - OTH-OTHER AGENCIES NOT APPROVED
|
INSP-Sprinkler Rough-in/Hydro | 10/28/1997 | 10/28/1997 | 10/28/1997 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - CONTINUED ROUGH IN INSP COMPILED LIST OF DEFICIENCIES ON ALL
|
INSP-Sprinkler Rough-in/Hydro | 10/27/1997 | 10/27/1997 | 10/27/1997 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - DRY SYSTEMS SPKLR RIUGH IN FAIL ALSO TRIP TESTED LARGE SYSTE SYSTEMS
|
INSP - Final | 10/23/1997 | 10/23/1997 | 10/23/1997 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - TRIP TEST ON DP SYSTEMS LARGER SYSTEM FAILED 60 SEC WATER TO
|
INSP-Sprinkler Rough-in/Hydro | 10/21/1997 | 10/22/1997 | 10/22/1997 | A | PART |
Joe Tawney
|
|
|
10/22/97 406 - WEST JR HIGH OK ON HYDRO TESTS OF 2 WET & 2 DRY SYSTEMS STILL NEED TO HYDRO TEST FDC
|
INSP - Framing/Rough-in | 10/2/1997 | 10/2/1997 | 10/2/1997 | P | PASS |
|
|
|
10/02/97 338 - roof nailing made ok
|
INSP - Framing/Rough-in | 10/1/1997 | 10/1/1997 | 10/2/1997 | P | NR |
|
|
|
10/02/97 338 - canclled by the contractor
|
INSP - Final | 9/25/1997 | 9/25/1997 | 9/25/1997 | | PASS |
|
|
|
/ / 338 - not ready OTH-OTHER AGENCIES NOT APPROVED need p/z and achd ally ok
|
INSP - Framing/Rough-in | 9/25/1997 | 9/25/1997 | 9/25/1997 | | PASS |
|
|
|
/ / 338 - rof sheathing madeok ok to drysheath
|
INSP - Framing/Rough-in | 9/25/1997 | 9/25/1997 | 9/25/1997 | | PASS |
|
|
|
/ / 338 - rof sheathing madeok ok to drysheath
|
INSP - Framing/Rough-in | 9/16/1997 | 9/16/1997 | 9/16/1997 | P | PART |
|
|
|
09/16/97 338 - AROUND 1 OR 2 IF YOU CAN MAKE IT misc roof sheathing nail
|
INSP - Framing/Rough-in | 9/15/1997 | 9/16/1997 | 9/16/1997 | A | NR |
|
|
|
09/16/97 338 - as early a.m. as possible not ready
|
INSP - Framing/Rough-in | 9/16/1997 | 9/16/1997 | 9/16/1997 | | NR |
|
|
|
/ / 338 - not ready did not call to cancell
|
INSP - Framing/Rough-in | 9/3/1997 | 9/3/1997 | 9/3/1997 | P | FAIL |
|
|
|
09/03/97 338 - C/N ISSUED NEED JOINT TREATMENT PER CORRECTION NOTICE
|
INSP - Carpentry | 8/29/1997 | 8/29/1997 | 8/29/1997 | | PASS |
|
|
|
/ / 338 - east side ready for the tapingROOF LINE THROUGH THE NEW ATTI
|
INSP - Wall cover | 8/29/1997 | 8/29/1997 | 8/29/1997 | P | PASS |
|
|
|
08/29/97 338 - 2 hr . wall on the roof PART MADE OK
|
INSP-Sprinkler Rough-in/Hydro | 8/28/1997 | 8/28/1997 | 8/28/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON ROUGH IN OF FRONT CANOPY INSP BY RICK
|
INSP - Framing/Rough-in | 8/27/1997 | 8/27/1997 | 8/28/1997 | P | NR |
|
|
|
08/27/97 338 - other agencies nt approved
|
INSP - Temporary occupancy | 8/25/1997 | 8/25/1997 | 8/25/1997 | P | FAIL |
|
|
|
08/25/97 338 - 1 o'clock no access to the occ req card
|
INSP - Final | 8/22/1997 | 8/22/1997 | 8/22/1997 | P | PART |
|
|
|
08/22/97 338 - temp to be signed monday
|
INSP-Final Inspection | 8/22/1997 | 8/22/1997 | 8/22/1997 | P | NR |
Joe Tawney
|
|
|
08/22/97 406 - FINAL NOT READY FOR FINAL
|
INSP-Sprinkler Rough-in/Hydro | 8/22/1997 | 8/22/1997 | 8/22/1997 | | PART |
|
|
|
OK ON HYDRO TEST FOR CAFETERIA
|
INSP - Framing/Rough-in | 8/20/1997 | 8/20/1997 | 8/21/1997 | P | CANC |
Jim Sly
|
|
|
08/21/97 316 - Gave to P Paine. roof 2hr wall ready at 4:00
|
INSP - Conference | 8/18/1997 | 8/18/1997 | 8/18/1997 | | PASS |
|
|
|
/ / 338 - on th e extension of the 2-hour wall
|
INSP - Wall cover | 8/18/1997 | 8/18/1997 | 8/18/1997 | | PASS |
|
|
|
08/18/97 338 - 2 HR WALL CONFERENCE part made ok on the upper section wi 08-19-97 my call
|
INSP - Wall cover | 8/18/1997 | 8/18/1997 | 8/18/1997 | | PASS |
|
|
|
08/18/97 338 - 2 HR WALL CONFERENCE part made ok on the upper section wi 08-19-97 my call
|
INSP - Framing/Rough-in | 8/13/1997 | 8/14/1997 | 8/14/1997 | A | PASS |
|
|
|
08/14/97 338 - FRAMING ON ROOF
|
INSP-Supply line flush | 8/13/1997 | 8/13/1997 | 8/13/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND FLUSH
|
INSP - Framing/Rough-in | 8/1/1997 | 8/4/1997 | 8/4/1997 | A | PASS |
Russ Owen
|
|
|
08/04/97 407 - ROOF NAILING
|
INSP-Sprinkler Rough-in/Hydro | 7/30/1997 | 7/31/1997 | 7/31/1997 | A | PART |
Joe Tawney
|
|
|
07/31/97 406 - SPKLR ROUGH IN OF CORRIDORS IN MAIN BLDG OK TO COVER
|
INSP-Supply line flush | 7/31/1997 | 7/31/1997 | 7/31/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND FLUSH
|
INSP - Ceiling grid | 7/29/1997 | 7/30/1997 | 7/30/1997 | A | PART |
|
|
|
07/30/97 338 - partial made ok 07-28-97
|
INSP - Framing/Rough-in | 7/29/1997 | 7/30/1997 | 7/30/1997 | A | PART |
|
|
|
07/30/97 338 - partial ok on th roof decking
|
INSP - Framing/Rough-in | 7/23/1997 | 7/24/1997 | 7/24/1997 | A | PASS |
|
|
|
07/24/97 338 - LATE MORNING NAILING 100 FT SECTION OF THE ROOF DECK NAILING OF THE CEILING IN THE GYM
|
INSP - Framing/Rough-in | 7/23/1997 | 7/23/1997 | 7/22/1997 | P | CANC |
|
|
|
07/23/97 338 - ROOF NAILINGcancelled by Art/superint. recalled for 07-24
|
INSP - Wall cover | 7/18/1997 | 7/18/1997 | 7/17/1997 | P | PART |
|
|
|
07/18/97 338 - FIRE WALL NAILING nailing is ok still need the fire caulk all but the perimetet above which will be fire caulked assys still to co
|
INSP - Framing/Rough-in | 7/17/1997 | 7/17/1997 | 7/17/1997 | P | PART |
Wes Worcester
|
|
|
DRYWALL 1st layer 2 hr wall on corridor side ok. ok to put on 1st layer and replace one broken piece of sheetrock, need eng for cable tray penetration at end of corridor wall.
|
INSP - Framing/Rough-in | 7/16/1997 | 7/16/1997 | 7/17/1997 | P | PART |
|
|
|
07/16/97 338 - done by 342
|
INSP - Framing/Rough-in | 7/16/1997 | 7/16/1997 | 7/16/1997 | P | NR |
Wes Worcester
|
|
|
no one on site, couldn't find wall that needed inspection
|
INSP - Framing/Rough-in | 7/14/1997 | 7/15/1997 | 7/15/1997 | A | PART |
|
|
|
07/15/97 338 - partial ok first layer on the 2-hr not ready
|
INSP - Conference | 7/10/1997 | 7/10/1997 | 7/10/1997 | | PASS |
|
|
|
/ / 338 - ctr called to cancell insp til late p.m.
|
INSP - Framing/Rough-in | 7/9/1997 | 7/10/1997 | 7/10/1997 | A | PART |
|
|
|
/ / 338 - partial roof nailing only arch to inspect al FDN -OK FOUNDATION
|
INSP - Framing/Rough-in | 7/3/1997 | 7/7/1997 | 7/7/1997 | A | NR |
|
|
|
07/07/97 338 - nr
|
INSP - Wall cover | 7/2/1997 | 7/3/1997 | 7/3/1997 | P | NR |
|
|
|
07/03/97 338 - FIRE WALL
|
INSP - Wall cover | 7/2/1997 | 7/2/1997 | 7/3/1997 | P | CANC |
|
|
|
07/02/97 338 - 2 hour fire wall contractor cancelled til tomorrow
|
INSP - Framing/Rough-in | 6/30/1997 | 7/1/1997 | 7/1/1997 | A | FAIL |
|
|
|
07/01/97 338 - c/n issued on the 2-hour wall
|
INSP - Carpentry | 6/25/1997 | 6/26/1997 | 6/26/1997 | A | PASS |
|
|
|
06/26/97 338 - ROOF NAILING mate ok for next 100 ft to the east at the s
|
INSP - Conference | 6/26/1997 | 6/26/1997 | 6/26/1997 | | PASS |
|
|
|
/ / 338 - WITH BLANKER NEED 2 LAYERS TOTAL FOR THE 5/8 GYP ON THE GYM APPROVED PLAN MUST REPAIR ALL ACCESS CUTR OUTS IN THE EXISTING TO RUN EL
|
INSP - Conference | 6/25/1997 | 6/26/1997 | 6/26/1997 | A | PASS |
|
|
|
06/26/97 338 - made ok on the 2-hour wall exeption submittall recieved a
|
INSP - Resubmittals | 6/26/1997 | 6/26/1997 | 6/26/1997 | | PASS |
|
|
|
/ / 338 - recieved, reviewed resubmittal for 2-hour equilv. foe 1/2" g and 5/8" gyp over same at existing wall resubs will be attached to file drawings
|
INSP - Framing/Rough-in | 6/23/1997 | 6/24/1997 | 6/24/1997 | A | PASS |
|
|
|
06/24/97 338 - roof sheathing on the s.w. 100 ft +-
|
INSP - Framing/Rough-in | 6/18/1997 | 6/19/1997 | 6/19/1997 | A | PART |
|
|
|
06/19/97 338 - ROOF NAILING nailing ok c/n issued on the lateral support rquirements and nail size descrepancies
|
INSP - Conference | 6/17/1997 | 6/17/1997 | 6/17/1997 | | PASS |
|
|
|
/ / 338 - QUESTIONS ON THE 2 HOUR WALL ASSY IN THE MAIN CORRIDOR INSID
|
INSP - Framing/Rough-in | 6/16/1997 | 6/17/1997 | 6/17/1997 | A | NR |
|
|
|
06/17/97 338 - NOT A FRAME INSP IT IS A CONFERENCE
|