Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberBLD97-00602
StatusFinaled
Name DOUG MATTHEWS
Site Address 7709 W OVERLAND RD
Project NameTHE BOISE SPECTRUM
Customer Number 
ePlanReviewNo
Description
THE BOISE SPECTRUM BUILDING "B" (SHELL BUILDING) - TO BUILD A NEW 23,565 SQUARE FOOT, ONE STORY, SHELL AND CORE BUILDING CONSTRUCTED OF A CONCRETE SLAB FLOOR, STEEL STRUCTRUAL COLUMNS, STEEL TRUSSES AND METAL ROOF SYSTME, BUILT-UP ROOFING AND METAL ROOFING AT PITCHED ROOF AREAS, AND STEEL STUD EXTERIOR WALLS. THIS BUILDING IS FULLY FIRE SPRINKLED. SPRINKLERS ARE USED FOR ONE-HOUR FIRE-RESISTIVE SUBSTITUTION. PERMIT ALSO INCLUDES RELATED SITE IMPROVEMENTS. THIS PERMIT IS FOR A SHELL AND CORE BUILDING ONLY WITH FINISHED RESTROOMS AND CORRIDOR AREAS; THERE IS NO OCCUPANCY ALLOWED UNDER THIS PERMIT. A SEPARATE TENANT IMPROVEMENT PERMIT WILL BE REQUIRED TO FINISH EACH TENANT SPACE. THE APPLICANT HAS INDICATED THAT THIS SHELL BUILDING IS FOR A3 ASSEMBLY AND M RETAIL SHOPS OCCUPANCIES; THIS BUILDING IS AT IT'S MAXIMUM ALLOWABLE AREA AND MUST MAINTAIN A MINIMUM OF 60 FOOT YARDS ON THREE SIDES, NO ADDITONAL SQUARE FOOTAGE MAY BE ADDED TO THIS BUILDING AND THE AMOUNT OF ASSEMBLY OCCUPANCIES ARE LIMITED TO A TOTAL AGGREGATE AREA OF 13,200 SQUARE FEET. ANY OTHER PROPOSED OCCUPANCY GROUP MUST MEET ALL APPLICABLE CODE REQUIREMENTS. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. DR#25-97/PC#134-97/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final8/17/1999 8/17/1999 PASS
made ok other agencies signed off l/c issued # 16423
INSP-Final Inspection4/3/19984/3/19984/3/1998 PASS
REINSP OK FOR CERT OF COMPLETION
INSP - Final1/28/19981/29/19981/29/1998APART
Details
01/29/98 338 - temp occ made ok signed the temp col only
INSP-Final Inspection1/26/19981/27/19981/27/1998APASS
DetailsJoe Tawney
01/27/98 406 - BLDG B--SHELL--BILL-###-#### REINSP OK FOR TEMPORARY KNOX BOX DOOR HDWRE PERMANENT ADDRESS
INSP - Final1/20/19981/20/19981/20/1998PNR
Details
01/20/98 338 - ###-#### BILL walk through on the game world and the buil shells and corridors rcvd copy of purchase order for new doors for the required A-2.1 occ.
INSP - Final1/16/19981/16/19981/16/1998 PART
DetailsJoe Tawney
/ / 406 - ALARM TEST FOR SHELL PASS
INSP-Final Inspection1/13/19981/14/19981/14/1998PFAIL
DetailsJoe Tawney
01/14/98 406 - SCHEDULED FOR 1:00 PLEASE--###-#### BILL FOR ANY PROBLEMS FINAL ON SHELL FAIL DOORS SMOKE SEALS SPKLR ESCUTCHEONS
INSP-Sprinkler Rough-in/Hydro12/29/199712/30/199712/30/1997APART
DetailsJoe Tawney
12/30/97 406 - PARTIAL FINAL ON SHELL OK FOR TI NW CORNER
INSP-Final Inspection12/24/199712/26/199712/26/1997ANR
DetailsJoe Tawney
12/26/97 406 - BLDG B FINAL NOT READY FOR INSPECTION
INSP-Sprinkler Rough-in/Hydro12/23/199712/24/199712/26/1997APART
DetailsJoe Tawney
12/24/97 406 - OK ON HYDRO TEST
INSP - Framing/Rough-in12/1/199712/1/199712/1/1997PPART
Details
12/01/97 338 -
INSP - Framing/Rough-in11/18/199711/18/199711/18/1997PPART
Details
/ / 333 - pendind special insp report
INSP-Sprinkler Rough-in/Hydro11/17/199711/17/199711/17/1997 PART
DetailsJoe Tawney
/ / 406 - OK ON PARTIAL ROUGH IN OF BLDG
INSP - Framing/Rough-in9/30/19979/30/19979/30/1997PPART
Details
10/01/97 338 - partial made ok for the south wall only
INSP-Supply line flush9/15/19979/15/19979/15/1997 PART
DetailsJoe Tawney
/ / 406 - OK ON UNDERGROUND FLUSH
INSP-Sprinkler Rough-in/Hydro9/11/19979/12/19979/12/1997ANR
DetailsJoe Tawney
09/12/97 406 - UNDERGROUND FLUSH NOT READY RESCH