INSP - Final | 12/23/1997 | 12/23/1997 | 12/23/1997 | P | PASS |
Wes Worcester
|
|
|
12/23/97 342 - East end of 2nd floor, exit, handicap restroom, etc. - Fi this one, please. ì
|
INSP - Conference | 10/9/1997 | 10/9/1997 | 10/9/1997 | P | PEND |
Bob Archibald
|
|
|
Discussed fire stopping requirements for shafts.
|
INSP - Conference | 9/17/1997 | 9/17/1997 | 9/17/1997 | | PASS |
Wes Worcester
|
|
|
/ / 342 - calling public works re:bathroom and shower facilities
|
INSP - Final | 9/2/1997 | 9/2/1997 | 9/2/1997 | P | PART |
Wes Worcester
|
|
|
phased construction w/mis permits for three TI's
|
INSP - Conference | 8/29/1997 | 8/29/1997 | 8/29/1997 | P | PASS |
Wes Worcester
|
|
|
call for final on each mis TI
|
INSP-Conference | 8/29/1997 | 8/29/1997 | 8/29/1997 | A | NR |
Wes Worcester
|
|
|
10 AM MEETING...talked to Rick and will go bk for final this pm
|
INSP-Final Inspection | 8/29/1997 | 8/29/1997 | 8/29/1997 | P | PART |
|
|
|
c/n issued, alarms not correct, pull on smoke circuit, strobes out of order
|
INSP-Conference | 8/29/1997 | 8/29/1997 | 8/28/1997 | A | FAIL |
|
|
|
10 AM MEETING COULD NOT MAINTAIN PRESSURE ON TWO OF THE SUITES, ONE TO BE OCCUPIED, CORRIDOR SEPS NOT COMPLETE
|
INSP - Framing/Rough-in | 8/6/1997 | 8/6/1997 | 8/6/1997 | P | PART |
Wes Worcester
|
|
|
08/06/97 342 - Go up to the second floor and find the contractor and the floor and the rough-in on the fire doors. looking for approved plans Wes
|
INSP - Framing/Rough-in | 8/6/1997 | 8/6/1997 | 8/6/1997 | | NR |
Wes Worcester
|
|
|
/ / 342 - not finished framing
|
INSP - Framing/Rough-in | 8/6/1997 | 8/6/1997 | 8/6/1997 | | NR |
Wes Worcester
|
|
|
/ / 342 - not finished framing
|
INSP - Framing/Rough-in | 8/1/1997 | 8/1/1997 | 8/1/1997 | P | PASS |
|
|
|
08/01/97 333 - GLASS IN STAIRWAY, 2ND FLOOR tempered ok
|
INSP - Framing/Rough-in | 7/22/1997 | 7/22/1997 | 7/21/1997 | P | PASS |
|
|
|
07/21/97 333 - unit a and d
|
INSP - Framing/Rough-in | 7/16/1997 | 7/17/1997 | 7/17/1997 | P | PART |
|
|
|
07/17/97 333 - B&C only
|
INSP - Framing/Rough-in | 7/11/1997 | 7/15/1997 | 7/15/1997 | A | PART |
Wes Worcester
|
|
|
2ND FLOOR GHF OK
|
INSP - Framing/Rough-in | 7/8/1997 | 7/8/1997 | 7/9/1997 | P | part |
|
|
|
07/09/97 333 - 2ND FLOOR
|
INSP - Conference | 6/30/1997 | 6/30/1997 | 6/30/1997 | A | PART |
Wes Worcester
|
|
|
met w/Carl
|
INSP - Framing/Rough-in | 6/27/1997 | 6/30/1997 | 6/30/1997 | A | PART |
Wes Worcester
|
|
|
|
INSP - Framing/Rough-in | 6/30/1997 | 6/30/1997 | 6/30/1997 | A | PART |
Wes Worcester
|
|
|
atria area ok
|
INSP - Framing/Rough-in | 6/26/1997 | 6/27/1997 | 6/27/1997 | P | PART |
Wes Worcester
|
|
|
PARTIAL frame as questions on "corridor" at atrium and "tunnel assy" to firedoor. Note 20 min doors on door schedule on plan.
|
INSP - Framing/Rough-in | 6/17/1997 | 6/18/1997 | 6/18/1997 | A | PASS |
|
|
|
06/18/97 333 - FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 6/17/1997 | 6/17/1997 | 6/17/1997 | P | CANC |
|
|
|
06/17/97 333 - canceled by Pat
|
INSP - Framing/Rough-in | 6/13/1997 | 6/16/1997 | 6/16/1997 | A | PART |
|
|
|
06/16/97 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETEDok to cover all
|