INSP - Final | 7/24/1997 | 7/25/1997 | 7/25/1997 | A | PASS |
Russ Owen
|
|
|
07/25/97 407 - key over front door
|
INSP - Letter of compliance | 7/25/1997 | 7/25/1997 | 7/25/1997 | | PASS |
Russ Owen
|
|
|
/ / 407 - lc #12759 note room behind garage unfinished.
|
INSP - Letter of compliance | 7/25/1997 | 7/25/1997 | 7/25/1997 | | PASS |
Russ Owen
|
|
|
/ / 407 - lc #12759 note room behind garage unfinished.
|
INSP - Final | 7/22/1997 | 7/23/1997 | 7/23/1997 | A | NR |
Russ Owen
|
|
|
07/23/97 407 - not ready
|
INSP - Energy code compliance | 6/23/1997 | 6/24/1997 | 6/24/1997 | A | PASS |
Russ Owen
|
|
|
06/24/97 407 - REINSPECT ENERGY ok but contractor and sheetrockers have been told not to install sheetro directly to duct work in garage wil need to have independant framing afo rock.
|
INSP - Energy code compliance | 6/20/1997 | 6/23/1997 | 6/23/1997 | A | FAIL |
Russ Owen
|
|
|
06/23/97 407 - insulation needs clearance from flue pipe, also the duct will have need to be completely coverd with sheetrock contractor has tol he is planning on this.
|
INSP - Energy code compliance | 6/19/1997 | 6/20/1997 | 6/23/1997 | P | NR |
Russ Owen
|
|
|
06/20/97 407 - LATE PM. not ready.
|
INSP - Framing/Rough-in | 6/18/1997 | 6/19/1997 | 6/19/1997 | P | PASS |
Russ Owen
|
|
|
06/19/97 407 - LATE PM
|
INSP - Footings | 5/21/1997 | 5/22/1997 | 5/22/1997 | A | PASS |
Russ Owen
|
|
|
05/22/97 407 - WIP -WORK IN PROGRESS poured no plan on site appears to be ok 15"wx7"d.
|