INSP-Final Inspection | 11/3/1997 | 11/4/1997 | 11/5/1997 | A | CANC |
Joe Tawney
|
|
|
11/04/97 406 - done previous by Rick J
|
INSP - Final | 11/3/1997 | 11/4/1997 | 11/4/1997 | P | PASS |
Jim Storey
|
|
|
11/04/97 301 - final ok pending p/w
|
Permanent Occupancy | | 11/4/1997 | 11/4/1997 | | DONE |
|
|
|
|
INSP - Framing/Rough-in | 10/10/1997 | 10/13/1997 | 10/13/1997 | A | PASS |
Jim Storey
|
|
|
10/13/97 301 - FRAM-OK FRAMING
|
INSP - Final | 9/19/1997 | 9/22/1997 | 9/22/1997 | A | PASS |
Jim Storey
|
|
|
09/22/97 301 - FNL -OK FINAL temp
|
INSP-Final Inspection | 8/11/1997 | 8/12/1997 | 8/12/1997 | A | FAIL |
|
|
|
no paved access, c/n issued
|
INSP - Wall cover | 5/15/1997 | 5/15/1997 | 5/15/1997 | P | PASS |
Jim Storey
|
|
|
05/15/97 301 - CONCRETE BOND BEAM INSPECTION MASN-REBAR OK first lift.
|
INSP - Foundation | 5/1/1997 | 5/1/1997 | 5/1/1997 | P | PASS |
Jim Storey
|
|
|
05/01/97 301 - STEM WALL FDN -OK FOUNDATION
|
INSP - Footings | 4/29/1997 | 4/29/1997 | 4/29/1997 | P | NR |
Jim Storey
|
|
|
04/29/97 301 - WIP -WORK IN PROGRESS
|