INSP - Framing/Rough-in | 1/21/1998 | 1/22/1998 | 1/22/1998 | P | PASS |
Jim Storey
|
|
|
01/22/98 301 - bld #1 joe, ###-#### FRAM-OK FRAMING/ wall fire penatrations ok
|
INSP - Final | 11/13/1997 | 11/14/1997 | 11/14/1997 | P | PASS |
Jim Storey
|
|
|
11/14/97 301 - FNL -OK FINAL
|
INSP-Final Inspection | 10/30/1997 | 10/31/1997 | 10/31/1997 | P | CANC |
Rick Jackson
|
|
|
structural permit only, nothing for fire code.
|
INSP - Conference | 7/23/1997 | 7/23/1997 | 7/23/1997 | | PART |
Jim Storey
|
|
|
/ / 301 - recieved submital for fire proofing for approval (ad fire fl the assembly for the 2hr area wall configuration continewity submital to faxed for review 7/23/97
|
INSP - Conference | 7/8/1997 | 7/8/1997 | 7/8/1997 | | PART |
Jim Storey
|
|
|
/ / 301 - recieved special insp. reports for review.
|
INSP - Wall cover | 6/30/1997 | 7/1/1997 | 7/1/1997 | A | FAIL |
Jim Storey
|
|
|
07/01/97 301 - fab 1 defuser unable to verify approved assbl. ì
|
INSP - Conference | 6/10/1997 | 6/11/1997 | 6/11/1997 | P | PART |
Jim Storey
|
|
|
06/11/97 301 - "PROGRESS" INSPECTION....JOE DALSOGLA? ###-#### PAGER - ###-#### DIAL 96313 GEN -GENERAL INSPECTION RFI REQUISTED ON SPECIAL INSP. REPORTS
|
INSP - Framing/Rough-in | 4/30/1997 | 5/5/1997 | 5/5/1997 | A | CANC |
Jim Storey
|
|
|
05/05/97 301 -
|