INSP - Framing/Rough-in | 3/12/1998 | 3/12/1998 | 3/12/1998 | P | PASS |
|
|
|
03/12/98 333 - FRAM-OK FRAMING
|
INSP - Final | 2/26/1998 | 2/26/1998 | 2/26/1998 | P | PASS |
|
|
|
02/27/98 333 - card signed for temp
|
INSP-Final Inspection | 2/25/1998 | 2/26/1998 | 2/26/1998 | A | PART |
Rick Jackson
|
|
|
jim ###-#### insp jon alrm, fire doors exit lighting emer lighting temp approved. knox box
|
INSP - Conference | 2/24/1998 | 2/24/1998 | 2/24/1998 | | PASS |
|
|
|
/ / 333 - resubmittal
|
INSP - Framing/Rough-in | 2/11/1998 | 2/12/1998 | 2/12/1998 | P | PART |
|
|
|
02/12/98 333 - restrooms 2nd okJIM ###-####
|
INSP-Alarm Testing | 1/28/1998 | 1/30/1998 | 1/30/1998 | A | FAIL |
Rick Jackson
|
|
|
SCHEDULED FOR 10:30---CORRINE AT ###-#### NFPA 72 certification, door latching in north stair tower, emergency lights, elevator doors not installed, knox box.
|
INSP - Final | 1/29/1998 | 1/29/1998 | 1/29/1998 | P | PART |
|
|
|
01/29/98 333 - pre fina;.
|
INSP-Alarm Testing | 1/29/1998 | 1/29/1998 | 1/29/1998 | P | PASS |
Rick Jackson
|
|
|
tested sprinkler flow and tampers - okay.
|
INSP-Sprinkler Rough-in/Hydro | 1/23/1998 | 1/23/1998 | 1/23/1998 | P | PASS |
Rick Jackson
|
|
|
hydro of dry standpipe system - had to repair leak at basement - okay after repair.
|
INSP-Sprinkler Rough-in/Hydro | 1/23/1998 | 1/23/1998 | 1/23/1998 | A | PASS |
Rick Jackson
|
|
|
rough-in okay. hydro okay. water temp of circulating system between 100-110.
|
INSP - Framing/Rough-in | 12/31/1997 | 1/2/1998 | 1/2/1998 | A | PART |
|
|
|
01/02/98 333 - 4th floor restrooms
|
INSP-Sprinkler Rough-in/Hydro | 12/16/1997 | 12/16/1997 | 12/16/1997 | P | PASS |
Rick Jackson
|
|
|
12/16/97 409 - hydro of 4th floor only. approved sprinkler plans not on 4th floor and attic area - okay
|
INSP - Framing/Rough-in | 11/13/1997 | 11/13/1997 | 11/13/1997 | A | PART |
|
|
|
11/13/97 333 - shafts ok
|
INSP - Framing/Rough-in | 11/12/1997 | 11/12/1997 | 11/12/1997 | P | CANC |
|
|
|
|
INSP - Roof | 10/28/1997 | 10/28/1997 | 10/28/1997 | P | PASS |
|
|
|
10/28/97 333 - framing ok
|
INSP - Carpentry | 10/10/1997 | 10/10/1997 | 10/10/1997 | A | PASS |
|
|
|
10/10/97 333 - resubmittal
|
INSP - Framing/Rough-in | 10/10/1997 | 10/10/1997 | 10/10/1997 | P | PASS |
|
|
|
10/10/97 333 - ROOF FRAMING ok
|
INSP - Footings | 8/25/1997 | 8/26/1997 | 8/26/1997 | A | PASS |
|
|
|
08/26/97 333 - MCCARTY BUILDING FTG -OK FOOTING
|
INSP - Conference | 8/14/1997 | 8/13/1997 | 8/13/1997 | P | PASS |
|
|
|
delivered resub
|
INSP - Carpentry | 7/31/1997 | 7/31/1997 | 7/31/1997 | | PASS |
|
|
|
/ / 333 - gave Jim approved resub
|
INSP - Conference | 7/28/1997 | 7/28/1997 | 7/28/1997 | | PASS |
|
|
|
/ / 333 - resubmittal of stair towers
|