INSP - Final | 2/6/1998 | 2/9/1998 | 2/9/1998 | A | PASS |
Jim Sly
|
|
|
02/08/98 316 - Final OK
|
INSP - Final | 2/5/1998 | 2/6/1998 | 2/6/1998 | A | NR |
Jim Sly
|
|
|
02/06/98 316 - NR ###-#### ì
|
INSP - Final | 12/30/1997 | 12/30/1997 | 12/30/1997 | P | FAIL |
Jim Sly
|
|
|
12/30/97 316 - C/N...Need shell and core final.......
|
INSP - Final | 12/30/1997 | 12/30/1997 | 12/30/1997 | P | FAIL |
Jim Sly
|
|
|
12/30/97 316 - C/N...Need to complete draftstops, Need engineering for s
|
INSP - Temporary occupancy | 12/23/1997 | 12/23/1997 | 12/23/1997 | P | FAIL |
Jim Sly
|
|
|
12/23/97 316 - C/N...Shell...Need letter of approval from spec insp..Ins
|
INSP - Final | 12/12/1997 | 12/12/1997 | 12/12/1997 | P | CANC |
Rick Jackson
|
|
|
12/12/97 409 - contractor said he didn't call for this...
|
INSP-Final Inspection | 10/2/1997 | 10/3/1997 | 10/3/1997 | A | PASS |
Joe Tawney
|
|
|
10/03/97 406 - FINAL ON SHELL OK FOR CERT OF COMPLETION
|
INSP - Framing/Rough-in | 7/30/1997 | 7/31/1997 | 7/31/1997 | A | PART |
Jim Sly
|
|
|
07/30/97 316 - hangers straps bolts etc.
|
INSP - Framing/Rough-in | 7/22/1997 | 7/23/1997 | 7/23/1997 | A | NR |
Wes Worcester
|
|
|
nailing and blocking----entire roof and sheer walls. not finished nailing off and will call when done and ready
|
INSP - Framing/Rough-in | 7/16/1997 | 7/17/1997 | 7/17/1997 | A | PART |
Jim Sly
|
|
|
07/16/97 316 - Shear wall insp...and E and W walls OK for cover...
|
INSP-Conference | 7/1/1997 | 7/1/1997 | 7/1/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - CONF WITH RICO OF STEED CONSTR AND JIM SLY BOISE STRUC INSPE ISSUED STOP WORK ORDER ON PROJECT. COMBUSTIBLE MATERIAL BEING STORED AND ON SITE WITHOUT REQUIRED HYDRANT PROTECTION.
|
INSP-Conference | 7/1/1997 | 7/1/1997 | 7/1/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - CONF WITH RICO OF STEED CONSTR AND JIM SLY BOISE STRUC INSPE ISSUED STOP WORK ORDER ON PROJECT. COMBUSTIBLE MATERIAL BEING STORED AND ON SITE WITHOUT REQUIRED HYDRANT PROTECTION.
|