INSP - Final | 9/8/1997 | 9/8/1997 | 9/8/1997 | P | PASS |
Russ Owen
|
|
|
|
INSP - Letter of compliance | 9/9/1997 | 9/8/1997 | 9/8/1997 | P | PASS |
Russ Owen
|
|
|
LC#12823
|
INSP - Final | 9/5/1997 | 9/5/1997 | 9/5/1997 | P | PART |
Russ Owen
|
|
|
09/05/97 407 - need a mechanical correction resolved.
|
INSP - Framing/Rough-in | 7/17/1997 | 7/18/1997 | 7/18/1997 | A | FAIL |
Russ Owen
|
|
|
07/18/97 407 - reinspection
|
INSP - Energy code compliance | 7/11/1997 | 7/11/1997 | 7/11/1997 | P | PASS |
Russ Owen
|
|
|
07/11/97 407 - RE-INSP.
|
INSP - Framing/Rough-in | 7/11/1997 | 7/11/1997 | 7/11/1997 | P | PART |
Russ Owen
|
|
|
07/11/97 407 - REINSPECTION STILL NEED TO ADDRESS THE ENGINEERING AT THE GARAGE LEFT NOTICE OK TO SHEETROCK EXCEPT FOR GARAGE.
|
INSP - Energy code compliance | 7/9/1997 | 7/10/1997 | 7/10/1997 | A | FAIL |
Russ Owen
|
|
|
07/10/97 407 - also re-insp framing. need to re-apply some vapor barrier also remove insulation from flue pip
|
INSP - Framing/Rough-in | 7/3/1997 | 7/3/1997 | 7/7/1997 | P | FAIL |
Russ Owen
|
|
|
07/03/97 407 -
|