INSP - Final | 12/7/1998 | 12/8/1998 | 12/8/1998 | A | PASS |
Jim Sly
|
|
|
12/08/98 316 -
|
Permanent Occupancy | | 12/8/1998 | 12/8/1998 | | DONE |
|
|
|
|
INSP - Final | 12/1/1998 | 12/2/1998 | 12/2/1998 | A | FAIL |
Jim Sly
|
|
|
12/02/98 316 - Scheduled by Hello!.
|
INSP - Final | 11/17/1998 | 11/18/1998 | 11/18/1998 | A | FAIL |
Jim Sly
|
|
|
11/18/98 316 - Conf................ Contact phone is [9395335].
|
INSP - Final | 7/17/1998 | 7/17/1998 | 7/17/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC
|
INSP-Sprinkler Rough-in/Hydro | 7/16/1998 | 7/16/1998 | 7/16/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON FDC HYDRO TEST
|
INSP - Final | 4/28/1998 | 4/28/1998 | 4/28/1998 | P | PART |
Jim Sly
|
|
|
04/28/98 316 - OK for Temp occ. pending ACHD OK
|
INSP - Final | 4/27/1998 | 4/27/1998 | 4/27/1998 | P | FAIL |
Jim Sly
|
|
|
04/27/98 316 - C/N...Need all req signatures...
|
INSP - Final | 4/23/1998 | 4/24/1998 | 4/24/1998 | P | PART |
Jim Sly
|
|
|
04/24/98 316 - OK for Temp Occ.......
|
INSP-Final Inspection | 4/23/1998 | 4/24/1998 | 4/24/1998 | P | PART |
Joe Tawney
|
|
|
04/24/98 406 - Scheduled by Hello!. FINAL OK FOR TEMP OCC ALARM SYSTEM FDC HYDRO TEST
|
INSP - Final | 4/23/1998 | 4/24/1998 | 4/23/1998 | A | CANC |
Jim Sly
|
|
|
Scheduled by Hello!. Contact phone is [9395335]. Cancelled by Hello! (Last update by [HLO]).
|
INSP-Supply line flush | 4/21/1998 | 4/21/1998 | 4/21/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND FLUSH
|
INSP-Final Inspection | 4/1/1998 | 4/2/1998 | 4/2/1998 | A | NR |
Joe Tawney
|
|
|
04/02/98 406 - BLDG 3--KATHY ###-#### NOT READY INSP CANCELLED WILL RESCHED
|
INSP-Conference | 2/17/1998 | 2/17/1998 | 2/17/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - CONF WITH VERN SUPT REGARDING ADDRESS NUMBERS ON BLDGS
|
INSP - Framing/Rough-in | 1/15/1998 | 1/16/1998 | 1/16/1998 | A | PART |
Jim Sly
|
|
|
01/15/98 316 - Roof Ceiling assembly OK 1st layer...
|
INSP - Conference | 1/15/1998 | 1/14/1998 | 1/14/1998 | P | PASS |
Tom Arcoraci
|
|
|
INSULATION QUES
|
INSP - Energy code compliance | 1/13/1998 | 1/14/1998 | 1/14/1998 | A | PASS |
Tom Arcoraci
|
|
|
01/14/98 408 - BLDG 3--PLEASE CALL ###-#### BEFORE YOU GO KATHY
|
INSP - Framing/Rough-in | 1/9/1998 | 1/12/1998 | 1/12/1998 | P | PASS |
Jim Sly
|
|
|
01/12/98 316 -
|
INSP-Sprinkler Rough-in/Hydro | 1/9/1998 | 1/9/1998 | 1/9/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON ROUGH IN OF ANTIFREEZE LOOPS OK TO COVER BALCONIES AND
|
INSP - Carpentry | 12/23/1997 | 12/23/1997 | 12/23/1997 | P | PART |
Jim Sly
|
|
|
12/23/97 316 - BLDG 3--FIRE CAULKING Preliminary insp of.......
|
INSP-Sprinkler Rough-in/Hydro | 12/23/1997 | 12/23/1997 | 12/23/1997 | P | PASS |
Joe Tawney
|
|
|
12/23/97 406 - SPKLR ROUGH IN OK TO COVER
|
INSP-Sprinkler Rough-in/Hydro | 12/22/1997 | 12/22/1997 | 12/22/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - BLDG #3 OK ON HYDRO TEST
|
INSP - Carpentry | 11/25/1997 | 11/25/1997 | 11/25/1997 | A | PART |
Carl Dependahl
|
|
|
WALK THRU W/ SLY, VERN & SUBS...PRE-CON
|