Permanent Occupancy | | 12/11/1998 | 12/11/1998 | | DONE |
|
|
|
|
INSP - Final | 12/7/1998 | 12/8/1998 | 12/8/1998 | A | PASS |
Jim Sly
|
|
|
12/08/98 316 -
|
INSP - Final | 12/1/1998 | 12/2/1998 | 12/2/1998 | A | FAIL |
Jim Sly
|
|
|
12/02/98 316 - Scheduled by Hello!.
|
INSP - Final | 7/23/1998 | 7/23/1998 | 7/23/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC
|
INSP-Sprinkler Rough-in/Hydro | 7/14/1998 | 7/14/1998 | 7/14/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON HYDRO TEST OF FDC PIPING
|
INSP - Final | 6/25/1998 | 6/26/1998 | 6/26/1998 | A | PART |
Jim Sly
|
|
|
06/26/98 316 - OK for Temp Occ only....
|
INSP-Final Inspection | 6/25/1998 | 6/26/1998 | 6/26/1998 | A | PART |
Joe Tawney
|
|
|
06/26/98 406 - 9:00 am cathy ###-#### OK FOR TEMP OCC #303 SPKLR HD TOO CLOSE FDC HYDRO TEST
|
INSP-Supply line flush | 5/4/1998 | 5/4/1998 | 5/4/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND FLUSH
|
INSP - Energy code compliance | 3/30/1998 | 3/31/1998 | 3/31/1998 | P | PART |
Jim Sly
|
|
|
03/31/98 316 - BLDG 6 3rd floor only...
|
INSP - Framing/Rough-in | 3/30/1998 | 3/31/1998 | 3/31/1998 | P | PASS |
Jim Sly
|
|
|
03/31/98 316 - BLDG 6 C/N removed...OK all....
|
INSP - Framing/Rough-in | 3/30/1998 | 3/30/1998 | 3/30/1998 | P | FAIL |
Jim Sly
|
|
|
03/30/98 316 - Frame floor 1&2..C/N..Need protect can light, 403...and m
|
INSP - Framing/Rough-in | 3/27/1998 | 3/27/1998 | 3/27/1998 | P | PART |
Jim Sly
|
|
|
03/27/98 316 - Frame OK 3rd floor only.....
|
INSP - Framing/Rough-in | 3/19/1998 | 3/19/1998 | 3/19/1998 | P | PART |
Jim Sly
|
|
|
03/19/98 316 - FIRE CAULKING--BLDG 6-For pre rock areas at utility and b
|
INSP-Sprinkler Rough-in/Hydro | 2/26/1998 | 2/26/1998 | 2/26/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - OK ON SPKLR ROUGH IN HEAD LOCATION TO BE CHECKED AT FINAL
|