INSP - Final | 12/8/1998 | 12/8/1998 | 12/8/1998 | P | PASS |
Jim Sly
|
|
|
12/08/98 316 -
|
Permanent Occupancy | | 12/8/1998 | 12/8/1998 | | DONE |
|
|
|
|
INSP - Final | 12/1/1998 | 12/2/1998 | 12/2/1998 | P | FAIL |
Jim Sly
|
|
|
12/02/98 316 - Scheduled by Hello!.
|
INSP-Final Inspection | 11/13/1998 | 11/16/1998 | 11/16/1998 | A | PASS |
Joe Tawney
|
|
|
11/16/98 406 - Scheduled by Hello!. Contact phone is [9395335]. REINSP OK FOR PERM OCC
|
INSP - Conference | 7/27/1998 | 7/27/1998 | 7/27/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 - Conf Req for final....
|
INSP - Final | 7/21/1998 | 7/23/1998 | 7/23/1998 | P | PART |
Jim Sly
|
|
|
07/23/98 316 - OK for temp Occ
|
INSP-Alarm Testing | 7/21/1998 | 7/23/1998 | 7/23/1998 | A | PART |
Joe Tawney
|
|
|
07/23/98 406 - steve ###-#### ALL ALARMS TESTED OK
|
INSP-Final Inspection | 7/21/1998 | 7/23/1998 | 7/23/1998 | A | PART |
Joe Tawney
|
|
|
07/23/98 406 - steve ###-#### FINAL OK FOR TEMP OCC INSTALL ALL ESCUTCHEONS
|
INSP-Sprinkler Rough-in/Hydro | 7/16/1998 | 7/16/1998 | 7/16/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON FDC HYDRO TEST
|
INSP - Framing/Rough-in | 6/23/1998 | 6/24/1998 | 6/24/1998 | A | PASS |
Jim Sly
|
|
|
06/24/98 316 - Already completed ...entered wrong.....
|
INSP - Energy code compliance | 5/8/1998 | 5/8/1998 | 5/8/1998 | P | PASS |
Jim Sly
|
|
|
05/08/98 316 - Bld # 7 all OK Contact phone is [9395335].
|
INSP - Energy code compliance | 5/7/1998 | 5/8/1998 | 5/8/1998 | A | PART |
Jim Sly
|
|
|
05/08/98 316 - 3rd floor only..............t phone is [9395335].
|
INSP - Framing/Rough-in | 5/8/1998 | 5/8/1998 | 5/8/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 - All floors OK bld #7
|
INSP - Framing/Rough-in | 5/7/1998 | 5/8/1998 | 5/8/1998 | A | PART |
Jim Sly
|
|
|
05/08/98 316 - 3rd floor only................. is [9395335].
|
INSP - Energy code compliance | 5/5/1998 | 5/7/1998 | 5/7/1998 | A | FAIL |
Jim Sly
|
|
|
05/07/98 316 - NR Contact phone is [9395335].
|
INSP - Framing/Rough-in | 5/7/1998 | 5/7/1998 | 5/7/1998 | | FAIL |
Jim Sly
|
|
|
/ / 316 - C/N....Firecaulk, draftstops, handrails tight to wall.....
|
INSP - Framing/Rough-in | 5/5/1998 | 5/6/1998 | 5/6/1998 | P | FAIL |
Jim Sly
|
|
|
/ / 316 - C/N...Super to walk thru and correct per UBC......
|
INSP-Supply line flush | 5/4/1998 | 5/4/1998 | 5/4/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND FLUSH
|
INSP-Sprinkler Rough-in/Hydro | 3/5/1998 | 3/5/1998 | 3/5/1998 | P | PASS |
Joe Tawney
|
|
|
03/05/98 406 - after lunch please ###-####\cathy OK ON ROUGH IN
|
INSP - Foundation | 3/4/1998 | 3/4/1998 | 3/4/1998 | P | PART |
Jim Sly
|
|
|
03/04/98 316 - Holdowns and shear OK 1st floor is [9395335].
|