INSP - Final | 1/2/1998 | 1/2/1998 | 1/2/1998 | | PART |
|
|
|
/ / 338 - SIGNED THE TEMP COL
|
INSP - Final | 1/2/1998 | 1/2/1998 | 1/2/1998 | | PART |
|
|
|
/ / 338 - SIGNED THE TEMP COL
|
INSP - Final | 12/31/1997 | 12/31/1997 | 12/31/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - FINAL OK FOR CERT OF COMPL
|
INSP - Framing/Rough-in | 11/18/1997 | 11/19/1997 | 11/19/1997 | A | CANC |
|
|
|
sent to 333
|
INSP - Framing/Rough-in | 11/19/1997 | 11/19/1997 | 11/19/1997 | | PART |
|
|
|
/ / 333 - bathrooms ok will recall for firestoping at corridor walls a
|
INSP - Framing/Rough-in | 11/4/1997 | 11/5/1997 | 11/6/1997 | A | PART |
Jim Storey
|
|
|
11/05/97 301 - ceiling in computor rm. ok for cover all but at 2 hr occ. for fire stopping detial for through pentrations and clean room wall gyp part of the 2 hr assembly. isue fire stopping product required on both s of sleave penatrat
|
INSP - Framing/Rough-in | 9/8/1997 | 9/9/1997 | 9/9/1997 | A | PASS |
|
|
|
09/09/97 338 - HP #25 c/n issued made ok to cover
|
INSP - Conference | 8/27/1997 | 8/27/1997 | 8/28/1997 | P | PASS |
|
|
|
08/27/97 338 - made ok for the new tunnel corridor sys at the entry area
|
INSP - Conference | 8/6/1997 | 8/6/1997 | 8/6/1997 | P | PASS |
|
|
|
08/06/97 338 -
|
INSP - Conference | 8/1/1997 | 8/4/1997 | 8/4/1997 | A | CANC |
Russ Owen
|
|
|
08/04/97 407 - CONF. WITH YOU ON REMODEL JOB THEY ARE DOING, HE SAID YOU A.M. ??????????/PAT will call perry on phone just has a question about the kitchen remodel i other buuilding.
|
INSP - Foundation | 8/1/1997 | 8/4/1997 | 8/4/1997 | A | |
Russ Owen
|
|
|
POUR AT 10 A.M. SPECIAL INSPECTOR ON SITE.
|
INSP - Footings | 7/30/1997 | 7/30/1997 | 7/30/1997 | P | PASS |
|
|
|
07/30/97 338 - pouring a concrete footings made ok with sp insp approval
|
INSP - Foundation | 7/21/1997 | 7/22/1997 | 7/21/1997 | A | PASS |
|
|
|
07/22/97 338 - SPECIAL INSPECTOR ON SITE RE-BAR made ok with sp insp ble
|
INSP - Footings | 7/16/1997 | 7/17/1997 | 7/17/1997 | P | PASS |
|
|
|
07/17/97 338 - made ok with sp insp blessing
|
INSP - Masonry | 7/10/1997 | 7/11/1997 | 7/11/1997 | A | PART |
Tom Arcoraci
|
|
|
REFORCING BOND BEAM WALLS spec inspec on site
|
INSP - Masonry | 7/7/1997 | 7/8/1997 | 7/8/1997 | A | PASS |
|
|
|
07/08/97 338 - BUILDING #25 MASN-REBAR OK sp insp ok
|
INSP - Masonry | 7/1/1997 | 7/2/1997 | 7/2/1997 | A | PASS |
|
|
|
07/02/97 338 - MAS. RE-BAR r-bar placed ok to go with sp insp ok
|
INSP - Foundation | 6/30/1997 | 7/1/1997 | 7/1/1997 | A | PASS |
|
|
|
07/01/97 338 - made ok with sp insp approval
|
INSP - Masonry | 6/27/1997 | 6/30/1997 | 6/30/1997 | A | PASS |
|
|
|
06/30/97 338 - pouring concrete block walls made ok with sp insp approva
|
INSP - Masonry | 6/24/1997 | 6/25/1997 | 6/25/1997 | A | PASS |
|
|
|
06/25/97 338 - MASONRY BLK. MASN-REBAR OK WITH SP INSP APPROVAL
|
INSP - Footings | 6/19/1997 | 6/20/1997 | 6/20/1997 | A | PASS |
Tom Arcoraci
|
|
|
early am Buck ###-#### made ok w\spec app
|
INSP - Foundation | 6/12/1997 | 6/13/1997 | 6/13/1997 | A | PASS |
|
|
|
06/13/97 338 - made ok with sp insp approval
|
INSP - Foundation | 6/6/1997 | 6/9/1997 | 6/9/1997 | P | PASS |
|
|
|
06/09/97 338 - FND. WALL. EARLY PM. made ok with the sp insp blessing
|
INSP - Conference | 6/5/1997 | 6/5/1997 | 6/5/1997 | | PASS |
|
|
|
/ / 338 - conf witht he supper on the rain delays
|
INSP - Footings | 6/5/1997 | 6/5/1997 | 6/5/1997 | P | PASS |
|
|
|
06/05/97 338 - made ok with sp insp approval
|
INSP - Foundation | 6/5/1997 | 6/5/1997 | 6/5/1997 | P | PASS |
|
|
|
06/05/97 338 - made ok with sp insp approval
|
INSP - Footings | 6/3/1997 | 6/4/1997 | 6/4/1997 | P | NR |
|
|
|
06/04/97 338 - FOOTING REBAR ì
|
INSP - Footings | 5/30/1997 | 6/2/1997 | 6/2/1997 | A | PASS |
|
|
|
06/02/97 338 - ok with the sp insp blessing
|
INSP - Footings | 5/29/1997 | 5/30/1997 | 5/30/1997 | A | CANC |
|
|
|
05/30/97 338 - contr postponed till monday
|