INSP - Grading Inspection | 9/29/1997 | 9/29/1997 | 9/29/1997 | | PASS |
Rita DeYoung
|
|
|
Final grading approved.
|
INSP - Final | 9/25/1997 | 9/26/1997 | 9/26/1997 | P | PASS |
Wes Worcester
|
|
|
|
INSP - Letter of compliance | 9/26/1997 | 9/26/1997 | 9/26/1997 | P | PASS |
Wes Worcester
|
|
|
c/c issued
|
INSP - Energy code compliance | 7/2/1997 | 7/3/1997 | 7/3/1997 | A | NR |
Wes Worcester
|
|
|
|
INSP - Framing/Rough-in | 7/3/1997 | 7/3/1997 | 7/3/1997 | | PASS |
|
|
|
approved for cover corrections made ok.
|
INSP - Framing/Rough-in | 7/3/1997 | 7/3/1997 | 7/3/1997 | A | FAIL |
Wes Worcester
|
|
|
c/n removed, eng not on site for overheighth wall or non-hangered truss, plans not on site, several items not done
|
INSP - Carpentry | 7/2/1997 | 7/2/1997 | 7/2/1997 | A | PART |
Wes Worcester
|
|
|
|
INSP - Conference | 7/2/1997 | 7/2/1997 | 7/2/1997 | A | PASS |
Wes Worcester
|
|
|
MET W/FRAMER ON SITE
|
INSP - Framing/Rough-in | 7/1/1997 | 7/2/1997 | 7/2/1997 | A | NR |
Wes Worcester
|
|
|
|
INSP - Framing/Rough-in | 6/30/1997 | 6/30/1997 | 6/30/1997 | P | FAIL |
Wes Worcester
|
|
|
2 pgs, truss eng, engineering not done and incomplete, blocking, shear nailing, bcec penetrations, pt ld transfers, etc
|
INSP - Framing/Rough-in | 6/26/1997 | 6/27/1997 | 6/27/1997 | A | NR |
Wes Worcester
|
|
|
BCEC penetrations or caulking done, plans and engineering not on site, no insp performed
|
INSP - Conference | 4/17/1997 | 4/17/1997 | 4/17/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - talked to contractor about ftns. and inspection time
|
INSP - Footings | 4/16/1997 | 4/17/1997 | 4/17/1997 | A | PASS |
Alan Hauser
|
|
|
04/17/97 350 - ftns. and bar as per plan, setbacks ok
|
INSP - Foundation | 4/16/1997 | 4/17/1997 | 4/17/1997 | P | PASS |
Alan Hauser
|
|
|
04/17/97 350 - FND. WALL rebar as per plan
|