INSP - Final | 2/11/1998 | 2/12/1998 | 2/12/1998 | A | PASS |
Jim Storey
|
|
|
02/11/98 301 - ###-#### matt FNL -OK FINAL routed for fee check. if ok send l/c to bud marz mail stop card atched to occ. req. ì
|
INSP - Wall cover | 8/7/1997 | 8/7/1997 | 8/7/1997 | | PASS |
Jim Storey
|
|
|
/ / 301 - rated wall at corridor replaced and penatrations fire stoppe
|
INSP-Final Inspection | 7/28/1997 | 7/28/1997 | 7/28/1997 | P | PART |
|
|
|
rough in bldg 26 penthouse chiller pump &mcc room. location ok, need high temp head by heater, need inspectors test, ?protect stair tower?
|
INSP - Framing/Rough-in | 7/23/1997 | 7/23/1997 | 7/23/1997 | | PASS |
Jim Storey
|
|
|
/ / 301 - fire stopping for gycol piping ok for wall containment
|