INSP - Final | 10/17/1997 | 10/17/1997 | 10/17/1997 | | PASS |
Russ Owen
|
|
|
/ / 407 -
|
INSP - Framing/Rough-in | 10/17/1997 | 10/17/1997 | 10/17/1997 | P | CANC |
Russ Owen
|
|
|
10/17/97 407 - rein. this is a final not a framing insp.
|
INSP - Letter of compliance | 10/17/1997 | 10/17/1997 | 10/17/1997 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#14017
|
INSP - Letter of compliance | 10/17/1997 | 10/17/1997 | 10/17/1997 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#14017
|
INSP - Final | 10/15/1997 | 10/16/1997 | 10/16/1997 | A | FAIL |
Russ Owen
|
|
|
10/16/97 407 - READY AFTER 10:00 left correction.
|
INSP - Framing/Rough-in | 8/12/1997 | 8/11/1997 | 8/12/1997 | P | PASS |
Russ Owen
|
|
|
re-insp 1 item .
|
INSP - Framing/Rough-in | 8/4/1997 | 8/5/1997 | 8/5/1997 | A | PART |
Russ Owen
|
|
|
08/05/97 407 - re-inspection ì
|
INSP - Energy code compliance | 7/23/1997 | 7/23/1997 | 7/23/1997 | P | PASS |
Russ Owen
|
|
|
07/23/97 407 -
|
INSP - Framing/Rough-in | 7/23/1997 | 7/23/1997 | 7/23/1997 | P | PART |
Russ Owen
|
|
|
07/23/97 407 - RE-INSPECTION ok to sheetrock all except for the garage front still need to have corre resolved about engineering talk with the contractor about this 7/23/97. all other corrections ok.
|
INSP - Framing/Rough-in | 7/15/1997 | 7/16/1997 | 7/16/1997 | A | FAIL |
Russ Owen
|
|
|
07/16/97 407 -
|
INSP - Footings | 6/3/1997 | 6/3/1997 | 6/3/1997 | P | PASS |
Russ Owen
|
|
|
06/03/97 407 - NO APPROVED PLAN ON SITE APPEARS TO BE OK. WIP -WORK IN PROGRESS. POURED BEFORE INSPECTION.
|