Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD97-00937
StatusFinaled
Name J J NORTHS
Site Address 6681 W FAIRVIEW AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
To replace sheetrock as necessary in scullery area of 1st floor and replace wall sheetrock and 1-hr. rated ceiling system in the basement beneath scullery due to water damage from leaking plumbing. Additional work may include replacement of floor joists as necessary upon review by structural engineer. Additional engineering and verification of 1-hr. ceiling system to be coordinated with the structural inspector. NOTE: This building is fully fire sprinklered as a substitution for 1-hr. construction. (P.C.#207-97) PRP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Letter of compliance9/10/1997 9/10/1997 PASS
Letter of Compliance #12950 issued 9-10-97 to the Wright Brothers.
INSP - Final8/29/19978/29/19978/29/1997PPASS
DetailsJoe Tawney
08/29/97 406 - Joe, I have the occ. req. card for this. I will sign for made the inspection and approved it. OK FOR CERT OF COMPL
INSP - Final8/29/19978/29/19978/29/1997PPASS
Details
08/29/97 338 - PLUMBING IS FINALED, CALL ME SO I CAN SIGN THE CARD NEED TO RESIGN FR ME
INSP - Ceiling grid8/27/19978/28/19978/28/1997ANR
Details
08/28/97 338 - CALL ###-#### CHRIS , WITH WRIGHT BROS. SO HE CAN MEET WI NO OCC REQ CARD ON SITE
INSP - Ceiling grid8/21/19978/21/19978/21/1997 CANC
Details
08/21/97 338 - CALL CHRIS LEONARD AT ###-#### 15-30 MINUTES BEFORE GOING PLEASE rescheduled for 08-22-97
INSP - Ceiling grid8/21/19978/21/19978/21/1997 CANC
Details
08/21/97 338 - CALL CHRIS LEONARD AT ###-#### 15-30 MINUTES BEFORE GOING PLEASE rescheduled for 08-22-97
INSP - Conference8/21/19978/21/19978/21/1997 PASS
Details
/ / 338 - will reschedule for the p.m. with ctr
INSP - Framing/Rough-in7/23/19977/23/19977/22/1997PPASS
Details
07/23/97 338 - CALL 20 TO 30 MINUTES NOTICE. ###-#### CHRIS LENORD. FRAM-OK FRAMING
INSP - Conference5/29/19975/29/19975/29/1997 PASS
Details
/ / 338 - called plan review to confirm that permits were at this time confir about the resubmittals recieved to change the floor ceiling assy 8 minutes
INSP - Framing/Rough-in5/29/19975/29/19975/29/1997PPASS
Details
05/29/97 338 - call chris wright bros. ###-#### made ok more work to com assembly has been compromised through-out
INSP - Framing/Rough-in5/16/19975/19/19975/19/1997PPART
Details
05/20/97 333 - center room only