Permanent Occupancy | | 5/6/1998 | 5/6/1998 | | DONE |
|
|
|
|
INSP - Final | 3/9/1998 | 3/10/1998 | 3/10/1998 | A | PART |
Russ Owen
|
|
|
03/10/98 407 - talked with contractor ok for temp oc. still needs code e
|
INSP - Final | 3/4/1998 | 3/5/1998 | 3/5/1998 | A | PASS |
Russ Owen
|
|
|
03/05/98 407 - left corrections. 45 minutes before you go out
|
INSP-Final Inspection | 3/4/1998 | 3/4/1998 | 3/4/1998 | A | PASS |
Rick Jackson
|
|
|
final occ approved
|
INSP-Final Inspection | 2/26/1998 | 2/27/1998 | 2/27/1998 | A | NR |
Rick Jackson
|
|
|
scheduled by contractor for 8:30. dampers didn't close with detector, bad base. will reschedule
|
INSP - Final | 2/25/1998 | 2/26/1998 | 2/26/1998 | P | NR |
Russ Owen
|
|
|
need fire approval spoke to contractor will recall.WILL CALL YOU TO SCHEDULE A TIME..
|
INSP-Final Inspection | 2/25/1998 | 2/26/1998 | 2/26/1998 | P | FAIL |
Rick Jackson
|
|
|
DAN WILL CALL YOU TO SCHEDULE A TIME...###-#### will be ready at 2:00 pm detector relay for dampers didn't work, will reinspect on 2/27
|
INSP - Framing/Rough-in | 12/23/1997 | 12/23/1997 | 12/23/1997 | P | PART |
Russ Owen
|
|
|
12/23/97 407 - had an item for the engineer to address.ok to rock except
|
INSP - Framing/Rough-in | 12/19/1997 | 12/22/1997 | 12/23/1997 | P | NH |
Russ Owen
|
|
|
12/22/97 407 - no one there left a note to recall.
|
INSP - Carpentry | 12/19/1997 | 12/19/1997 | 12/19/1997 | A | PART |
Carl Dependahl
|
|
|
W RUSS & GS AT SITE RE 1HR & PLAN
|
INSP - Framing/Rough-in | 12/18/1997 | 12/19/1997 | 12/19/1997 | A | PART |
Russ Owen
|
|
|
WENT OUT WITH GEORGE TO RESOLVE SOME ITEMS.
|
INSP - Framing/Rough-in | 12/17/1997 | 12/17/1997 | 12/18/1997 | P | FAIL |
Russ Owen
|
|
|
12/17/97 407 - left corrections with contractor.
|
INSP - Framing/Rough-in | 11/19/1997 | 11/21/1997 | 11/21/1997 | A | PART |
Russ Owen
|
|
|
EARLY AM PLEASE--LDS CHURCH left corrections ,this was a pre-inspection only,as noted on correction.
|
INSP - Roof | 11/13/1997 | 11/14/1997 | 11/14/1997 | A | PASS |
|
|
|
11/14/97 333 - LDS CHURCH RF -OK ROOF NAILING
|
INSP - Foundation | 9/29/1997 | 9/30/1997 | 9/30/1997 | A | PASS |
Russ Owen
|
|
|
09/30/97 407 - CHURCH--READY AFTER 11:00 foundation ok, also church has hired special inspector, for all concrete will inspect the fnd,walls.
|