INSP - Final | 7/3/1997 | 7/7/1997 | 7/7/1997 | A | NR |
Russ Owen
|
|
|
07/07/97 407 - need plumbing and electrical final.
|
INSP - Framing/Rough-in | 6/26/1997 | 6/27/1997 | 6/30/1997 | A | PASS |
Russ Owen
|
|
|
06/27/97 407 - AS PER PLANS.
|
INSP - Framing/Rough-in | 6/24/1997 | 6/25/1997 | 6/25/1997 | A | NR |
Russ Owen
|
|
|
06/25/97 407 - need electrical inspection.
|
INSP - Footings | 5/13/1997 | 5/13/1997 | 5/13/1997 | P | PASS |
Russ Owen
|
|
|
AROUND 1:00.NO PLAN ON SITE FOUNDATION WILL BE FOR A PREFAB METAL SUN ROOM. LEFT NOTE TO POUR AT OWN RISK.
|