INSP - Framing/Rough-in | 7/25/1997 | 7/25/1997 | 7/25/1997 | P | PART |
|
|
|
07/25/97 338 - framing ok for the 2hour sound walls ok to cover same wit
|
INSP - Framing/Rough-in | 7/22/1997 | 7/23/1997 | 7/22/1997 | A | CANC |
|
|
|
07/23/97 338 - WILL INSPECT 07-24-97 #1
|
INSP - Framing/Rough-in | 7/22/1997 | 7/22/1997 | 7/22/1997 | | PART |
|
|
|
/ / 338 - 2-hr wall at the east end south of the c/line CI-LETTER OF COMPLIANCE ISSUED 13423
|
INSP - Footings | 6/19/1997 | 6/20/1997 | 6/20/1997 | A | PART |
Tom Arcoraci
|
|
|
338 area...pend spec insp
|
INSP - Foundation | 6/3/1997 | 6/4/1997 | 6/4/1997 | P | PASS |
|
|
|
06/04/97 338 - OK FOR THE PANELS AS THE SP INSP WAS OK AND WERE INSPECTE WHAT YOU REQUESTED AND SINCE YOU HAVE A MEETING A.M. I PUT BOTH INSPECTI THIS ONE/?????? PAT
|