INSP - Final | 6/18/1997 | 6/19/1997 | 6/19/1997 | P | PASS |
Jim Sly
|
|
|
06/19/97 316 - FINAL REINSPECT OK
|
INSP - Final | 6/18/1997 | 6/19/1997 | 6/19/1997 | A | PASS |
Joe Tawney
|
|
|
06/19/97 406 - FINAL REINSPECT OK FOR PERM OCC
|
Permanent Occupancy | | 6/19/1997 | 6/19/1997 | | DONE |
|
|
|
|
INSP - Final | 6/12/1997 | 6/13/1997 | 6/13/1997 | P | FAIL |
Jim Sly
|
|
|
06/13/97 316 - FINAL REINSPECT Not Ready...do prev corr notic...ie. all
|
INSP-Final Inspection | 6/12/1997 | 6/13/1997 | 6/13/1997 | A | NR |
Joe Tawney
|
|
|
06/13/97 406 - FINAL REINSPECT NOT READY FOR REINSPECTION ELECT NOT SIGNED OFF
|
INSP - Final | 6/11/1997 | 6/12/1997 | 6/12/1997 | P | FAIL |
Jim Sly
|
|
|
06/11/97 316 - SUITE H Need to complete grid ceiling, Required signatur
|
INSP-Final Inspection | 6/11/1997 | 6/12/1997 | 6/12/1997 | A | NR |
Joe Tawney
|
|
|
06/12/97 406 - SUITE H TODD ###-#### NOT READY FOR INSP
|
INSP - Framing/Rough-in | 5/28/1997 | 5/28/1997 | 5/28/1997 | P | PASS |
Jim Sly
|
|
|
05/28/97 316 - OK to cover Pending plumbing rough in inspection and appr
|