INSP - Final | 8/26/1997 | 8/26/1997 | 8/26/1997 | P | PASS |
Tom Arcoraci
|
|
|
|
INSP - Letter of compliance | 8/26/1997 | 8/26/1997 | 8/26/1997 | P | PASS |
Tom Arcoraci
|
|
|
|
INSP - Final | 8/22/1997 | 8/25/1997 | 8/25/1997 | A | CANC |
Jim Sly
|
|
|
08/22/97 316 - Gave to Tom A.
|
INSP - Conference | 8/4/1997 | 8/4/1997 | 8/4/1997 | A | PASS |
Tom Arcoraci
|
|
|
engineer letter of ok on way
|
INSP - Stop Work Order | 7/31/1997 | 7/31/1997 | 7/31/1997 | P | FAIL |
Tom Arcoraci
|
|
|
framing correction notice not completed steel i beams need connection per eng plan sleepers must be attached per eng plan shear wall bed 3 and 4 must b oked by eng
|
INSP - Framing/Rough-in | 7/24/1997 | 7/25/1997 | 7/25/1997 | A | NR |
Tom Arcoraci
|
|
|
07/25/97 408 -
|
INSP - Framing/Rough-in | 7/24/1997 | 7/24/1997 | 7/24/1997 | P | NR |
Tom Arcoraci
|
|
|
RE-INSPECTION
|
INSP - Energy code compliance | 7/23/1997 | 7/23/1997 | 7/23/1997 | P | PASS |
Tom Arcoraci
|
|
|
|
INSP - Framing/Rough-in | 7/23/1997 | 7/23/1997 | 7/23/1997 | P | NR |
Tom Arcoraci
|
|
|
needs egineer to ok
|
INSP - Framing/Rough-in | 7/18/1997 | 7/18/1997 | 7/18/1997 | P | FAIL |
Tom Arcoraci
|
|
|
correction notice needs eng to ok some items
|
INSP - Framing/Rough-in | 7/17/1997 | 7/17/1997 | 7/17/1997 | P | NR |
Tom Arcoraci
|
|
|
no plum inspec
|
INSP - Framing/Rough-in | 7/17/1997 | 7/17/1997 | 7/17/1997 | P | CANC |
Jim Sly
|
|
|
07/17/97 316 - Gave to Tom A.
|
INSP - Footings | 5/27/1997 | 5/27/1997 | 5/27/1997 | P | PART |
Jim Sly
|
|
|
05/27/97 316 - Poured W/O inspection....soil and height OK...setbacks??? 3:15
|