Permit Information
Permit NumberBLD97-01243
StatusFinaled
Name CHILDREN'S HOME SOCIETY OF
Site Address 740 E WARM SPRINGS AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
To conduct remodeling and renovations to an existing 2 story structure with basement used for office and counseling per approved plans on file. Work to include mechanical and geothermal replacement, replacement of stair for accessibility, electrical system replacement, installation of an elevator and lobby, upgrade corridor in basement to one-hour construction, new handrails on existing ramp.NOTE: This building is fully fire sprinklered. Fire sprinklers substitute for 1-hr construction. (P.C.#262-97) DRH97-0074.(RMH)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 6/9/19986/9/1998 DONE
Details
INSP - Final5/26/19985/26/19985/26/1998PPART
DetailsWes Worcester
05/26/98 342 - final/ ###-#### 1478
INSP-Final Inspection5/21/19985/26/19985/26/1998APASS
DetailsRick Jackson
Fire Life Safety, Tony, ###-#### - 1478 all items corrected. occ approved
INSP-Final Inspection5/15/19985/19/19985/19/1998AFAIL
DetailsRick Jackson
Sprinkler & Life Safety @ the Children's Home, Tony @ ###-#### then dial 1478. alarm problems - blown panel. corection notice issued.
INSP - Concrete4/13/19984/13/19984/13/1998 FAIL
Denied request for reduction of ADA van parking space width.
INSP - Wall cover3/27/19983/27/19983/27/1998PPASS
DetailsWes Worcester
03/27/98 342 - ceiling grid Hello!. Contact phone is [3840927].
INSP-Sprinkler Rough-in/Hydro3/16/19983/17/19983/17/1998APASS
DetailsRick Jackson
###-####-shelly undergound, FDC and sprinkler system hydro passed.
INSP-Sprinkler Rough-in/Hydro3/3/19983/4/19983/4/1998APART
DetailsRick Jackson
CHILDRENS HOME--SHELLIE ###-#### 1 and 2 floors. Riser still needs bracing, 2nd needs seismic, heads needed in heat pump closets, basement room under stairs will require head, anti-freeze system not complete
INSP - Framing/Rough-in2/26/19982/27/19982/27/1998APART
DetailsWes Worcester
02/27/98 342 - ###-#### wait for tone 1478
INSP - Framing/Rough-in2/17/19982/18/19982/18/1998APART
DetailsWes Worcester
02/18/98 342 - ###-#### 1478 ì
INSP-Supply line flush2/17/19982/18/19982/18/1998APASS
DetailsRick Jackson
###-#### SHELLY underground flush okay
INSP-Conference2/12/19982/13/19982/13/1998APART
DetailsWes Worcester
02/12/98 342 - CONFE. AT 8:30 AS PER WES W. TONY ###-####-1478 AFTER TON
INSP - Framing/Rough-in2/3/19982/4/19982/4/1998APART
DetailsWes Worcester
02/04/98 342 - tony ###-#### after tone 1478 fire caulking
INSP - Conference2/3/19982/3/19982/3/1998 PART
DetailsWes Worcester
/ / 342 - with plan check
INSP - Framing/Rough-in2/2/19982/3/19982/3/1998APART
DetailsWes Worcester
02/03/98 342 - tony ###-#### after tone 1478
INSP-Sprinkler Rough-in/Hydro1/22/19981/23/19981/23/1998PPASS
DetailsRick Jackson
PROBLEM CALL SHELLIE AT ###-#### time changed to 1:00 pm per inspector and contractor request basement rough-in only. okay to cover. additional head needed in southwest room to cover area missed by sidewall.
INSP - Framing/Rough-in1/20/19981/21/19981/21/1998APART
DetailsWes Worcester
01/21/98 342 - need draft stop and corridor wall alcove termination deta
INSP - Conference1/15/19981/15/19981/15/1998 PASS
DetailsWes Worcester
/ / 342 - submit in duplicate changes in 1 hr corridor wall const and
INSP - Framing/Rough-in1/14/19981/15/19981/15/1998APART
DetailsWes Worcester
01/14/98 342 - Tony ###-#### tone 1478 ok to cover basement walls after
INSP - Carpentry1/13/19981/13/19981/13/1998 FAIL
DetailsWes Worcester
/ / 342 - install draft stops, corridor walls not terminated & not to
INSP - Conference1/13/19981/13/19981/13/1998 PART
DetailsWes Worcester
/ / 342 - meet arch on site re: 1 hr const and pvc penetrations
INSP - Framing/Rough-in1/12/19981/13/19981/13/1998PNR
DetailsWes Worcester
01/13/98 342 - Tony ###-#### 1478 after tone
INSP - Conference1/6/19981/6/19981/6/1998 PASS
Approved reduction of stair landing requirements on east end of structure (2-2.5"). 1994 UCBC Sec.605.2.
INSP - Footings1/5/19981/6/19981/6/1998APASS
DetailsTom Arcoraci
rebar TONY NOT TO BE FOUND FOOTINGS OK
INSP - Footings1/6/19981/5/19981/5/1998ANR
DetailsTom Arcoraci
WILL RECALL
INSP - Framing/Rough-in12/30/199712/31/199712/31/1997APART
DetailsTom Arcoraci
CHECKED HANGERS FOR JOISTS SO THEY CAN COVER THIS AREA OVER DOWN STAIRS ONLY
INSP - Conference12/19/199712/22/199712/22/1997APART
DetailsWes Worcester
12/22/97 342 -
INSP-Conference12/16/199712/17/199712/17/1997APART
DetailsRick Jackson
12/17/97 409 - SHELLY WILL CALL TO SET UP A TIME. talked with contractor about sprinkler requirements (front canopy doesn' require sprinklering onto porch), city comments to review
INSP - Conference12/10/199712/10/199712/10/1997 PASS
DetailsWes Worcester
/ / 342 - nrrd log, eng change etc
INSP - Foundation12/9/199712/10/199712/10/1997PNR
DetailsWes Worcester
12/10/97 342 - PREFER LATE PM
INSP - Conference12/9/199712/9/199712/9/1997 PART
DetailsWes Worcester
/ / 342 - need precon next Tues am....and I want to look at everything
INSP - Conference12/9/199712/9/199712/9/1997 PASS
DetailsWes Worcester
/ / 342 - conf w/Ron Hill
INSP - Footings12/9/199712/9/199712/9/1997 PART
DetailsWes Worcester
/ / 342 - already poured w/spec insp on site....
INSP - Framing/Rough-in12/8/199712/8/199712/9/1997PNR
DetailsWes Worcester
12/09/97 342 -
INSP - Framing/Rough-in1/2/19981/5/19981/5/1997ACANC
DetailsTom Arcoraci
REBAR LATE AM