Permanent Occupancy | | 6/9/1998 | 6/9/1998 | | DONE |
|
|
|
|
INSP - Final | 5/26/1998 | 5/26/1998 | 5/26/1998 | P | PART |
Wes Worcester
|
|
|
05/26/98 342 - final/ ###-#### 1478
|
INSP-Final Inspection | 5/21/1998 | 5/26/1998 | 5/26/1998 | A | PASS |
Rick Jackson
|
|
|
Fire Life Safety, Tony, ###-#### - 1478 all items corrected. occ approved
|
INSP-Final Inspection | 5/15/1998 | 5/19/1998 | 5/19/1998 | A | FAIL |
Rick Jackson
|
|
|
Sprinkler & Life Safety @ the Children's Home, Tony @ ###-#### then dial 1478. alarm problems - blown panel. corection notice issued.
|
INSP - Concrete | 4/13/1998 | 4/13/1998 | 4/13/1998 | | FAIL |
|
|
|
Denied request for reduction of ADA van parking space width.
|
INSP - Wall cover | 3/27/1998 | 3/27/1998 | 3/27/1998 | P | PASS |
Wes Worcester
|
|
|
03/27/98 342 - ceiling grid Hello!. Contact phone is [3840927].
|
INSP-Sprinkler Rough-in/Hydro | 3/16/1998 | 3/17/1998 | 3/17/1998 | A | PASS |
Rick Jackson
|
|
|
###-####-shelly undergound, FDC and sprinkler system hydro passed.
|
INSP-Sprinkler Rough-in/Hydro | 3/3/1998 | 3/4/1998 | 3/4/1998 | A | PART |
Rick Jackson
|
|
|
CHILDRENS HOME--SHELLIE ###-#### 1 and 2 floors. Riser still needs bracing, 2nd needs seismic, heads needed in heat pump closets, basement room under stairs will require head, anti-freeze system not complete
|
INSP - Framing/Rough-in | 2/26/1998 | 2/27/1998 | 2/27/1998 | A | PART |
Wes Worcester
|
|
|
02/27/98 342 - ###-#### wait for tone 1478
|
INSP - Framing/Rough-in | 2/17/1998 | 2/18/1998 | 2/18/1998 | A | PART |
Wes Worcester
|
|
|
02/18/98 342 - ###-#### 1478 ì
|
INSP-Supply line flush | 2/17/1998 | 2/18/1998 | 2/18/1998 | A | PASS |
Rick Jackson
|
|
|
###-#### SHELLY underground flush okay
|
INSP-Conference | 2/12/1998 | 2/13/1998 | 2/13/1998 | A | PART |
Wes Worcester
|
|
|
02/12/98 342 - CONFE. AT 8:30 AS PER WES W. TONY ###-####-1478 AFTER TON
|
INSP - Framing/Rough-in | 2/3/1998 | 2/4/1998 | 2/4/1998 | A | PART |
Wes Worcester
|
|
|
02/04/98 342 - tony ###-#### after tone 1478 fire caulking
|
INSP - Conference | 2/3/1998 | 2/3/1998 | 2/3/1998 | | PART |
Wes Worcester
|
|
|
/ / 342 - with plan check
|
INSP - Framing/Rough-in | 2/2/1998 | 2/3/1998 | 2/3/1998 | A | PART |
Wes Worcester
|
|
|
02/03/98 342 - tony ###-#### after tone 1478
|
INSP-Sprinkler Rough-in/Hydro | 1/22/1998 | 1/23/1998 | 1/23/1998 | P | PASS |
Rick Jackson
|
|
|
PROBLEM CALL SHELLIE AT ###-#### time changed to 1:00 pm per inspector and contractor request basement rough-in only. okay to cover. additional head needed in southwest room to cover area missed by sidewall.
|
INSP - Framing/Rough-in | 1/20/1998 | 1/21/1998 | 1/21/1998 | A | PART |
Wes Worcester
|
|
|
01/21/98 342 - need draft stop and corridor wall alcove termination deta
|
INSP - Conference | 1/15/1998 | 1/15/1998 | 1/15/1998 | | PASS |
Wes Worcester
|
|
|
/ / 342 - submit in duplicate changes in 1 hr corridor wall const and
|
INSP - Framing/Rough-in | 1/14/1998 | 1/15/1998 | 1/15/1998 | A | PART |
Wes Worcester
|
|
|
01/14/98 342 - Tony ###-#### tone 1478 ok to cover basement walls after
|
INSP - Carpentry | 1/13/1998 | 1/13/1998 | 1/13/1998 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - install draft stops, corridor walls not terminated & not to
|
INSP - Conference | 1/13/1998 | 1/13/1998 | 1/13/1998 | | PART |
Wes Worcester
|
|
|
/ / 342 - meet arch on site re: 1 hr const and pvc penetrations
|
INSP - Framing/Rough-in | 1/12/1998 | 1/13/1998 | 1/13/1998 | P | NR |
Wes Worcester
|
|
|
01/13/98 342 - Tony ###-#### 1478 after tone
|
INSP - Conference | 1/6/1998 | 1/6/1998 | 1/6/1998 | | PASS |
|
|
|
Approved reduction of stair landing requirements on east end of structure (2-2.5"). 1994 UCBC Sec.605.2.
|
INSP - Footings | 1/5/1998 | 1/6/1998 | 1/6/1998 | A | PASS |
Tom Arcoraci
|
|
|
rebar TONY NOT TO BE FOUND FOOTINGS OK
|
INSP - Footings | 1/6/1998 | 1/5/1998 | 1/5/1998 | A | NR |
Tom Arcoraci
|
|
|
WILL RECALL
|
INSP - Framing/Rough-in | 12/30/1997 | 12/31/1997 | 12/31/1997 | A | PART |
Tom Arcoraci
|
|
|
CHECKED HANGERS FOR JOISTS SO THEY CAN COVER THIS AREA OVER DOWN STAIRS ONLY
|
INSP - Conference | 12/19/1997 | 12/22/1997 | 12/22/1997 | A | PART |
Wes Worcester
|
|
|
12/22/97 342 -
|
INSP-Conference | 12/16/1997 | 12/17/1997 | 12/17/1997 | A | PART |
Rick Jackson
|
|
|
12/17/97 409 - SHELLY WILL CALL TO SET UP A TIME. talked with contractor about sprinkler requirements (front canopy doesn' require sprinklering onto porch), city comments to review
|
INSP - Conference | 12/10/1997 | 12/10/1997 | 12/10/1997 | | PASS |
Wes Worcester
|
|
|
/ / 342 - nrrd log, eng change etc
|
INSP - Foundation | 12/9/1997 | 12/10/1997 | 12/10/1997 | P | NR |
Wes Worcester
|
|
|
12/10/97 342 - PREFER LATE PM
|
INSP - Conference | 12/9/1997 | 12/9/1997 | 12/9/1997 | | PART |
Wes Worcester
|
|
|
/ / 342 - need precon next Tues am....and I want to look at everything
|
INSP - Conference | 12/9/1997 | 12/9/1997 | 12/9/1997 | | PASS |
Wes Worcester
|
|
|
/ / 342 - conf w/Ron Hill
|
INSP - Footings | 12/9/1997 | 12/9/1997 | 12/9/1997 | | PART |
Wes Worcester
|
|
|
/ / 342 - already poured w/spec insp on site....
|
INSP - Framing/Rough-in | 12/8/1997 | 12/8/1997 | 12/9/1997 | P | NR |
Wes Worcester
|
|
|
12/09/97 342 -
|
INSP - Framing/Rough-in | 1/2/1998 | 1/5/1998 | 1/5/1997 | A | CANC |
Tom Arcoraci
|
|
|
REBAR LATE AM
|