Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD97-01257
StatusFinaled
Name HEWLETT-PACKARD T.I.S. ADD.
Site Address 9700 W BETHEL CT
Project NameHP #25
Customer Number 
ePlanReviewNo
Description
(HEWLETT-PACKARD T.I.S.-BOISE ADDITION) Fire sprinklers used for building area increase. To finish a 26,900 square foot building shell addition for office, computer, generator, UPS, and accessory use. Work is to include 2 restrooms accessible to the disabled, two generator rooms (H-3 Occupancy), UPS room, access floor system, gypsum ceiling, suspended acoustical ceiling, interior nonbearing walls, exterior ramps and stairs, an extension to the "building link", interior doors, and a loading dock all per approved drawings, engineering, and plan check conditions on file. The shell was constructed under BLD97-0763. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. PC-267-97 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 3/26/19983/26/1998 DONE
Details
INSP - Final3/16/19983/17/19983/17/1998APASS
Details
03/17/98 338 - h.p #25 - contact: buck ###-####- made ok signed the perm card
INSP-Final Inspection3/12/19983/13/19983/13/1998PPASS
DetailsJoe Tawney
03/13/98 406 - SCHEDULED WITH JEFF FOR 1:00--###-#### REINSP OK FOR PERM OCC
INSP - Final12/30/199712/31/199712/31/1997PPART
Details
12/31/97 338 - bld #25 SIGNED THE TEMP COL
INSP-Final Inspection12/30/199712/31/199712/31/1997APASS
DetailsJoe Tawney
12/31/97 406 - BUCK WILL MEET YOU AT 11:00 REINSP FOR FINAL OK FOR TEMP OCC
INSP - Final12/29/199712/30/199712/30/1997PCANC
Details
12/30/97 338 - bld #25 cancelled by bucki
INSP - Final12/29/199712/29/199712/29/1997 FAIL
DetailsJoe Tawney
/ / 406 - FINAL FAIL ALARM SYSTEM MAG DOORS 1 HR SPKLR ROOM SPKLR HD
INSP - Conference12/3/199712/4/199712/4/1997APASS
Details
12/04/97 338 - made okPPAINE / 8:30 AM
INSP - Framing/Rough-in11/21/199711/21/199711/24/1997PPART
Details
made ok part verball c/ fixed in my presence
INSP - Conference11/12/199711/18/199711/18/1997ANR
DetailsJim Storey
11/18/97 301 - g slane had meeting.
INSP-Sprinkler Rough-in/Hydro11/3/199711/4/199711/4/1997APART
DetailsJoe Tawney
11/04/97 406 - MEET VANCE AT 9:00 OK ON PARTIAL HYDRO TEST OF PREACTION SYSTEM MAIN BLDG AREA
INSP - Framing/Rough-in10/1/199710/1/199710/2/1997PPASS
Details
10/02/97 338 - partial made ok