Permanent Occupancy | | 3/26/1998 | 3/26/1998 | | DONE |
|
|
|
|
INSP - Final | 3/16/1998 | 3/17/1998 | 3/17/1998 | A | PASS |
|
|
|
03/17/98 338 - h.p #25 - contact: buck ###-####- made ok signed the perm card
|
INSP-Final Inspection | 3/12/1998 | 3/13/1998 | 3/13/1998 | P | PASS |
Joe Tawney
|
|
|
03/13/98 406 - SCHEDULED WITH JEFF FOR 1:00--###-#### REINSP OK FOR PERM OCC
|
INSP - Final | 12/30/1997 | 12/31/1997 | 12/31/1997 | P | PART |
|
|
|
12/31/97 338 - bld #25 SIGNED THE TEMP COL
|
INSP-Final Inspection | 12/30/1997 | 12/31/1997 | 12/31/1997 | A | PASS |
Joe Tawney
|
|
|
12/31/97 406 - BUCK WILL MEET YOU AT 11:00 REINSP FOR FINAL OK FOR TEMP OCC
|
INSP - Final | 12/29/1997 | 12/30/1997 | 12/30/1997 | P | CANC |
|
|
|
12/30/97 338 - bld #25 cancelled by bucki
|
INSP - Final | 12/29/1997 | 12/29/1997 | 12/29/1997 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - FINAL FAIL ALARM SYSTEM MAG DOORS 1 HR SPKLR ROOM SPKLR HD
|
INSP - Conference | 12/3/1997 | 12/4/1997 | 12/4/1997 | A | PASS |
|
|
|
12/04/97 338 - made okPPAINE / 8:30 AM
|
INSP - Framing/Rough-in | 11/21/1997 | 11/21/1997 | 11/24/1997 | P | PART |
|
|
|
made ok part verball c/ fixed in my presence
|
INSP - Conference | 11/12/1997 | 11/18/1997 | 11/18/1997 | A | NR |
Jim Storey
|
|
|
11/18/97 301 - g slane had meeting.
|
INSP-Sprinkler Rough-in/Hydro | 11/3/1997 | 11/4/1997 | 11/4/1997 | A | PART |
Joe Tawney
|
|
|
11/04/97 406 - MEET VANCE AT 9:00 OK ON PARTIAL HYDRO TEST OF PREACTION SYSTEM MAIN BLDG AREA
|
INSP - Framing/Rough-in | 10/1/1997 | 10/1/1997 | 10/2/1997 | P | PASS |
|
|
|
10/02/97 338 - partial made ok
|