INSP - Final | 11/20/1997 | 11/19/1997 | 11/19/1997 | | PASS |
Russ Owen
|
|
|
|
INSP - Letter of compliance | 11/20/1997 | 11/19/1997 | 11/19/1997 | | PASS |
Russ Owen
|
|
|
lc#12838
|
INSP - Final | 11/18/1997 | 11/18/1997 | 11/18/1997 | P | FAIL |
Jim Storey
|
|
|
11/18/97 301 - trans to russ
|
INSP - Framing/Rough-in | 10/7/1997 | 10/7/1997 | 10/7/1997 | | PART |
Russ Owen
|
|
|
/ / 407 - re-insp, contractor has supplied letter from truss co about connection ok to sheetrock,still have exterior correction to resolve.
|
INSP - Framing/Rough-in | 10/2/1997 | 10/2/1997 | 10/3/1997 | P | PART |
Russ Owen
|
|
|
10/02/97 407 - ok to sheetrock still have 2 corrections left notice.
|
INSP - Framing/Rough-in | 9/16/1997 | 9/16/1997 | 9/17/1997 | P | FAIL |
Russ Owen
|
|
|
09/16/97 407 -
|
INSP - Carpentry | 9/16/1997 | 9/16/1997 | 9/16/1997 | P | FAIL |
Tom Arcoraci
|
|
|
shear wall
|
INSP - Framing/Rough-in | 9/15/1997 | 9/15/1997 | 9/15/1997 | P | NR |
Russ Owen
|
|
|
09/15/97 407 - no plans or truss details on site. no inspection.
|