Permanent Occupancy | | 10/2/1997 | 10/2/1997 | | DONE |
|
|
|
|
INSP - Final | 7/3/1997 | 7/3/1997 | 7/3/1997 | P | PART |
|
|
|
07/03/97 338 - signed the temp occ col on the occ req card
|
INSP - Final | 7/1/1997 | 7/1/1997 | 7/1/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP FOR FINAL OK FOR PERM OCC OK FOR ASSEMBLY PERMIT
|
INSP-Final Inspection | 6/30/1997 | 7/1/1997 | 7/1/1997 | A | FAIL |
Joe Tawney
|
|
|
07/01/97 406 - REINSP FOR FINAL FAIL EMERG LIGHT NOT WORED PROPERLY
|
INSP-Final Inspection | 6/30/1997 | 6/30/1997 | 6/30/1997 | | FAIL |
|
|
|
FINAL FAIL EMERG LIGHTS & OCC LOAD SIGN
|
INSP-Final Inspection | 6/26/1997 | 6/27/1997 | 6/27/1997 | A | NR |
Joe Tawney
|
|
|
I think that he may be confused NOT READY NO PLANS ON SITE WILL RESCH FOR MONDAY 7/30/97
|
INSP - Final | 6/25/1997 | 6/26/1997 | 6/26/1997 | A | NR |
|
|
|
06/26/97 338 - not ready wrong signoffs on the occ req card etc having n up at office and returned
|
INSP-Conference | 6/24/1997 | 6/24/1997 | 6/24/1997 | P | NH |
Joe Tawney
|
|
|
PHILLIP DAO, OASIS REST. ###-#### WANTS TO TALK TO INSPECTOR?? PERMIT HAS UNPAID VIOLATION HOLD ON IT NOT HOME CALLED ON PHONE WILL RESCH
|
INSP - Carpentry | 6/4/1997 | 6/5/1997 | 6/5/1997 | A | FAIL |
|
|
|
06/05/97 338 - HEATING DUCT OVER RANGE........ c/n issued paraput wall m for 18" down at the 2 hour wall
|
INSP - Framing/Rough-in | 6/3/1997 | 6/4/1997 | 6/4/1997 | P | NR |
|
|
|
06/04/97 338 -
|