INSP - Framing/Rough-in | 6/4/1997 | 6/5/1997 | 6/5/1997 | P | PASS |
|
|
|
06/05/97 338 - late afternoon please thank you!
|
INSP - Conference | 5/29/1997 | 5/29/1997 | 5/29/1997 | P | PASS |
|
|
|
05/29/97 338 - madeok to use 2each 7 1/4 microlams over the 5'-0" openin
|
INSP - Foundation | 5/16/1997 | 5/19/1997 | 5/20/1997 | A | |
Jim Storey
|
|
|
|
INSP - Footings | 5/15/1997 | 5/16/1997 | 5/16/1997 | A | PASS |
|
|
|
05/16/97 338 - READY AFTER 10 A.M.
|
INSP - Foundation | 5/16/1997 | 5/16/1997 | 5/16/1997 | | PASS |
|
|
|
/ / 338 - FDN -OK FOUNDATION
|