INSP - Final | 9/17/1998 | 9/18/1998 | 9/18/1998 | A | PASS |
|
|
|
09/17/98 338 - SIGNED THE PERM COL
|
Permanent Occupancy | | 9/18/1998 | 9/18/1998 | | DONE |
|
|
|
|
INSP - Final | 7/13/1998 | 7/14/1998 | 7/14/1998 | A | PART |
|
|
|
07/13/98 338 - suzanne ###-#### 406 is also going out am signed the temp
|
INSP-Final Inspection | 7/13/1998 | 7/14/1998 | 7/14/1998 | A | PASS |
Joe Tawney
|
|
|
07/14/98 406 - suzanne ###-#### REINSP OK FOR PERM OCC
|
INSP-Final Inspection | 7/10/1998 | 7/13/1998 | 7/13/1998 | A | FAIL |
Joe Tawney
|
|
|
07/13/98 406 - ###-#### REINSP FAIL SMOKE DETECTOR APT NMBRS LETTER FD ACCESS
|
INSP-Final Inspection | 7/8/1998 | 7/9/1998 | 7/9/1998 | P | FAIL |
Joe Tawney
|
|
|
07/09/98 406 - ###-#### FINAL FAIL DETECTORS ADDRESS & SUITE NMBRS
|
INSP - Final | 7/7/1998 | 7/8/1998 | 7/8/1998 | A | NR |
|
|
|
07/08/98 338 - OTH-OTHER AGENCIES NOT APPROVED NO INSP DONE CONFERENCE O
|
INSP - Framing/Rough-in | 4/30/1998 | 5/1/1998 | 5/1/1998 | P | PASS |
|
|
|
correction removed ok to cover
|
INSP - Framing/Rough-in | 4/28/1998 | 4/30/1998 | 4/30/1998 | A | PART |
|
|
|
PARTIAL OK TO START THE LOWER CEILINGS ONLY
|
INSP - Framing/Rough-in | 4/30/1998 | 4/30/1998 | 4/30/1998 | | PART |
|
|
|
04/30/98 338 - still some corrections okto start in the lower levels
|
INSP - Framing/Rough-in | 4/30/1998 | 4/30/1998 | 4/30/1998 | | PART |
|
|
|
04/30/98 338 - still some corrections okto start in the lower levels
|
INSP - Framing/Rough-in | 4/24/1998 | 4/27/1998 | 4/27/1998 | P | FAIL |
|
|
|
04/27/98 338 - OK TO INSU. ONLY C/N ISSUED
|
INSP - Foundation | 2/9/1998 | 2/9/1998 | 2/9/1998 | P | PASS |
|
|
|
02/09/98 338 - tony ###-#### after 3:30 p.m. foundation wall 2:55 no for placed ok to pour when the forms are set.
|
INSP - Footings | 2/6/1998 | 2/6/1998 | 2/6/1998 | P | FAIL |
Jim Storey
|
|
|
02/06/98 301 - tony ###-#### footings pwoi set backs appear to be ok but no plans on site.
|