Permanent Occupancy | | 8/11/1997 | 8/11/1997 | | DONE |
|
|
|
|
Permanent Occupancy | | 8/11/1997 | 8/11/1997 | | DONE |
|
|
|
|
INSP - Final | 7/30/1997 | 7/31/1997 | 7/31/1997 | A | PASS |
|
|
|
07/31/97 338 - joe is going at 8 a.m. to finalmade ok called cathy to be
|
INSP-Final Inspection | 7/30/1997 | 7/31/1997 | 7/31/1997 | A | PASS |
Joe Tawney
|
|
|
07/31/97 406 - he said you would be there at 8 a.m. REINSP FOR FINAL OK FOR PERM OCC
|
INSP - Final | 7/29/1997 | 7/30/1997 | 7/30/1997 | P | NR |
|
|
|
07/30/97 338 - cancelled by the contractoe OTH-OTHER AGENCIES NOT APPROVED
|
INSP-Final Inspection | 7/29/1997 | 7/30/1997 | 7/30/1997 | A | FAIL |
Joe Tawney
|
|
|
07/30/97 406 - FINAL FAIL EXIT SIGNS EMERG LIGHTS FIRE EXT
|
INSP - Framing/Rough-in | 7/24/1997 | 7/25/1997 | 7/25/1997 | P | PASS |
|
|
|
07/25/97 338 - ceiling grid SCLG-OK SUSPENDED CEILING
|
INSP - Framing/Rough-in | 7/16/1997 | 7/16/1997 | 7/17/1997 | P | PASS |
|
|
|
07/16/97 338 - done by 342
|
INSP - Framing/Rough-in | 7/16/1997 | 7/16/1997 | 7/16/1997 | P | PASS |
Wes Worcester
|
|
|
|