INSP - Final | 12/12/1997 | 12/12/1997 | 12/12/1997 | P | PASS |
Wes Worcester
|
|
|
12/12/97 342 -
|
INSP - Grading Inspection | 12/12/1997 | | 12/12/1997 | | PASS |
Rita DeYoung
|
|
|
Final grading and revegetation approved.
|
INSP - Conference | 11/4/1997 | 11/5/1997 | 11/5/1997 | P | PASS |
|
|
|
11/05/97 333 - talked about handrails
|
INSP - Conference | 10/6/1997 | 10/6/1997 | 10/6/1997 | P | PASS |
Wes Worcester
|
|
|
MET W/TERRY RECORDS AND SUPER ON SITE
|
INSP - Site Preparation | 10/6/1997 | 10/6/1997 | 10/6/1997 | P | PASS |
Wes Worcester
|
|
|
2:30 APT. YOU MADE WITH HIM??????
|
INSP - Framing/Rough-in | 10/1/1997 | 10/2/1997 | 10/2/1997 | P | PASS |
Wes Worcester
|
|
|
|
INSP - Framing/Rough-in | 9/30/1997 | 10/1/1997 | 10/1/1997 | A | PART |
Wes Worcester
|
|
|
framer not there...engineering done to date ok
|
INSP - Conference | 9/30/1997 | 9/30/1997 | 9/30/1997 | A | PASS |
Wes Worcester
|
|
|
called @ corrections and will post eng on job site
|
INSP - Energy code compliance | 9/30/1997 | 9/30/1997 | 9/30/1997 | P | PASS |
Wes Worcester
|
|
|
|
INSP - Framing/Rough-in | 9/30/1997 | 9/30/1997 | 9/30/1997 | A | PASS |
Wes Worcester
|
|
|
|
INSP - Framing/Rough-in | 9/25/1997 | 9/25/1997 | 9/25/1997 | P | FAIL |
Wes Worcester
|
|
|
truss brng, truss bracing, shr wall not continous to a ftg (interior), broken truss, r-38 in attic and r-6 in crawl
|
INSP - Carpentry | 9/10/1997 | 9/11/1997 | 9/11/1997 | A | NR |
Wes Worcester
|
|
|
09/10/97 342 - shr nailing not complete, need eng specs on generic shr a panels, need detail on shr transfer through 2 floors, need approved plan
|
INSP - Carpentry | 9/11/1997 | 9/11/1997 | 9/11/1997 | P | NR |
Wes Worcester
|
|
|
09/11/97 342 - 2nd trip still need eng exception for using staples, appr
|
INSP - Footings | 8/12/1997 | 8/12/1997 | 8/12/1997 | | PART |
Wes Worcester
|
|
|
/ / 342 - need soils test for ftg placed on fill
|
INSP - Framing/Rough-in | 8/12/1997 | 8/12/1997 | 8/12/1997 | P | NH |
Wes Worcester
|
|
|
08/12/97 342 - ready after 2:30
|
INSP - Foundation | 8/4/1997 | 8/5/1997 | 8/5/1997 | A | PASS |
Wes Worcester
|
|
|
08/04/97 342 - late a.m. foundation only, ftgs poured w/o inspection
|
INSP - Conference | 7/26/1997 | 7/26/1997 | 7/26/1997 | | PART |
Wes Worcester
|
|
|
/ / 342 - called by Walt Gann and I informed him of confrontation and site. he will meet me on site later after 4 and will ck cover personally have confonting individual off of site so I can access site for inspecti
|
INSP - Conference | 7/26/1997 | 7/26/1997 | 7/26/1997 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - Walt called me after 5 pm and I asked informed him that conf was still on site, I could not perform inspection, that his ftg is rejec and he is supposed to call Bob Monday am. I also stated Bob would handle
|
INSP - Conference | 7/26/1997 | 7/26/1997 | 7/26/1997 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - called Bob about problems on site and requested to place sto he told me not to.....
|
INSP - Conference | 7/26/1997 | 7/26/1997 | 7/26/1997 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - called number on developers sign asking for Walt....Kay had street to find numbers, asked her to have Walt call me about problems w/
|
INSP - Footings | 7/26/1997 | 7/26/1997 | 7/26/1997 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - went back for fourth time, confontational individual still o reverify cover or finish checking placing of rebar. Cover at garage wing inadequate, could see rebar horizontal next to earth w/less than 3" cove sidewalk above pou
|
INSP - Footings | 7/24/1997 | 7/25/1997 | 7/26/1997 | A | FAIL |
Wes Worcester
|
|
|
07/25/97 342 - late a.m. arrived at @ 11:30 inadequate cover, approved p
|
INSP - Footings | 7/25/1997 | 7/25/1997 | 7/26/1997 | P | FAIL |
Wes Worcester
|
|
|
07/26/97 342 - still does not have cover, no one walked ftgs to check, l call when done
|
INSP - Footings | 7/22/1997 | 7/24/1997 | 7/24/1997 | A | NR |
Wes Worcester
|
|
|
still placing rebar
|