INSP - Final | 10/2/1997 | 10/3/1997 | 10/2/1997 | A | NH |
Jim Sly
|
|
|
10/02/97 316 - Finaled on 10/2/97
|
INSP - Final | 10/1/1997 | 10/2/1997 | 10/2/1997 | A | FAIL |
Jim Sly
|
|
|
10/02/97 316 - C/N...Temp glass, bsmt smokes, misc crawl......
|
INSP - Final | 10/2/1997 | 10/2/1997 | 10/2/1997 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 13142
|
INSP - Letter of compliance | 10/2/1997 | 10/2/1997 | 10/2/1997 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 13142
|
INSP - Letter of compliance | 10/2/1997 | 10/2/1997 | 10/2/1997 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 13142
|
INSP - Conference | 8/5/1997 | 8/5/1997 | 8/5/1997 | A | PASS |
Tom Arcoraci
|
|
|
/ / 408 -
|
INSP - Carpentry | 8/4/1997 | 8/4/1997 | 8/4/1997 | | NR |
Tom Arcoraci
|
|
|
/ / 408 -
|
INSP - Energy code compliance | 8/1/1997 | 8/4/1997 | 8/4/1997 | A | FAIL |
Tom Arcoraci
|
|
|
08/04/97 408 -
|
INSP - Framing/Rough-in | 8/1/1997 | 8/4/1997 | 8/4/1997 | A | PART |
Tom Arcoraci
|
|
|
08/04/97 408 -
|
INSP - Energy code compliance | 7/31/1997 | 8/1/1997 | 8/1/1997 | A | FAIL |
Jim Sly
|
|
|
07/31/97 316 - NR
|
INSP - Framing/Rough-in | 7/31/1997 | 8/1/1997 | 8/1/1997 | A | FAIL |
Jim Sly
|
|
|
07/31/97 316 - C/N...Complete stairs....
|
INSP - Framing/Rough-in | 7/30/1997 | 7/31/1997 | 7/31/1997 | A | FAIL |
Jim Sly
|
|
|
07/30/97 316 - C/N....Point loads, truss bracing, stairs,....
|
INSP - Footings | 6/24/1997 | 6/25/1997 | 6/25/1997 | A | PART |
Jim Sly
|
|
|
06/24/97 316 - Poured W/O inspection (poured 6/24)...all OK except setb.
|