INSP - Final | 10/14/1997 | 10/15/1997 | 10/15/1997 | P | CANC |
Russ Owen
|
|
|
10/15/97 407 - transfer to tom.
|
INSP - Final | 10/15/1997 | 10/15/1997 | 10/15/1997 | A | PASS |
Tom Arcoraci
|
|
|
|
INSP - Letter of compliance | 10/15/1997 | 10/15/1997 | 10/15/1997 | A | PASS |
Tom Arcoraci
|
|
|
13037
|
INSP - Energy code compliance | 8/21/1997 | 8/22/1997 | 8/22/1997 | A | PASS |
Russ Owen
|
|
|
08/22/97 407 -
|
INSP - Framing/Rough-in | 8/21/1997 | 8/22/1997 | 8/22/1997 | A | PASS |
Russ Owen
|
|
|
08/22/97 407 - REINSPECTION
|
INSP - Framing/Rough-in | 8/20/1997 | 8/20/1997 | 8/20/1997 | | PART |
Jim Storey
|
|
|
08/20/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Footings | 6/24/1997 | 6/25/1997 | 6/25/1997 | A | CANC |
Russ Owen
|
|
|
06/25/97 407 - inspection done 6/24/97 n
|
INSP - Footings | 6/24/1997 | 6/24/1997 | 6/24/1997 | P | PASS |
Russ Owen
|
|
|
06/24/97 407 - EARLY START MID-PM need post footing at front of home also stairs will be poured later alos the 2 isolated footings in the garage.
|