INSP - Final | 10/20/1997 | 10/21/1997 | 10/21/1997 | A | NR |
Jim Storey
|
|
|
10/21/97 301 -
|
INSP - Final | 10/20/1997 | 10/20/1997 | 10/20/1997 | P | NR |
Jim Storey
|
|
|
10/20/97 301 - OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Wall cover | 9/19/1997 | 9/19/1997 | 9/19/1997 | P | FAIL |
Russ Owen
|
|
|
fire wall needs additional fasteners. left corrections.
|
INSP - Energy code compliance | 9/12/1997 | 9/12/1997 | 9/12/1997 | P | PASS |
Russ Owen
|
|
|
09/12/97 407 -
|
INSP - Framing/Rough-in | 9/10/1997 | 9/11/1997 | 9/12/1997 | P | FAIL |
Russ Owen
|
|
|
09/11/97 407 - left corrections.
|
INSP - Footings | 7/24/1997 | 7/24/1997 | 7/24/1997 | P | FAIL |
Russ Owen
|
|
|
plans call for 8" thick footings poured before insp.
|
INSP - Conference | 1/5/1998 | | 1/5/1997 | | PASS |
|
|
|
letter dated october 1st from briggs engineering has approved foundation.
|