INSP - Conference | 1/5/1998 | | 1/5/1998 | | PASS |
|
|
|
letter from briggs engineering dated october 1st 1997 has approved foundation.
|
INSP - Final | 10/28/1997 | 10/28/1997 | 10/29/1997 | P | CANC |
Russ Owen
|
|
|
transfer to tom.
|
INSP - Final | 10/29/1997 | 10/28/1997 | 10/28/1997 | | PASS |
Tom Arcoraci
|
|
|
|
INSP - Letter of compliance | 10/29/1997 | 10/28/1997 | 10/28/1997 | | PASS |
Tom Arcoraci
|
|
|
13046
|
INSP - Wall cover | 10/1/1997 | 10/2/1997 | 10/2/1997 | A | PART |
Russ Owen
|
|
|
10/02/97 407 - FIRE WALL ok except the section in the garage was not com
|
INSP - Energy code compliance | 9/24/1997 | 9/24/1997 | 9/24/1997 | P | PASS |
Russ Owen
|
|
|
09/24/97 407 -
|
INSP - Framing/Rough-in | 9/23/1997 | 9/24/1997 | 9/24/1997 | A | PASS |
Russ Owen
|
|
|
09/24/97 407 -
|
INSP - Framing/Rough-in | 9/24/1997 | 9/24/1997 | 9/24/1997 | | PART |
Russ Owen
|
|
|
/ / 407 - left corrections, NOTE; STILL NEED A LETER FROM BRIGS ENGINE TO THE FOUNDATION. TOLD DAVE WITH VANHESS AGAIN SAID HE WILL HAVE IT 9/2
|
INSP-Sprinkler Rough-in/Hydro | 8/14/1997 | 8/14/1997 | 8/15/1997 | P | CANC |
|
|
|
firewall single family home, sent in error, not a fire issue
|
INSP - Wall cover | 8/13/1997 | 8/13/1997 | 8/13/1997 | P | NR |
Russ Owen
|
|
|
fire wall
|
INSP - Set-back | 7/25/1997 | 7/25/1997 | 7/25/1997 | | PART |
Russ Owen
|
|
|
/ / 407 - see notes from confrence 7/26/97 bld97-1751
|
INSP - Footings | 7/24/1997 | 7/24/1997 | 7/24/1997 | P | FAIL |
Russ Owen
|
|
|
plans call for 8" thick footins. poured before insp.
|